|
|
(12 intermediate revisions by 4 users not shown) |
Line 1: |
Line 1: |
| {{process | | {{process |
− | |process_alternative_titles=Adoption of a Construction Licence/Revision Licence | + | |process_official_title=Preliminary approval of a building permit |
− | |process_application_description=Request by the owner of the project or of the legal right, with declarations of awards and studies. | + | |process_alternative_titles=Preliminary approval of building permit / revision permit |
− | |process_application_note=The application shall be accompanied by the declaration of delegation of the master of the work or of the legal right and the declarations of undertaking and study surveys of the engineers concerned.
| + | |process_description=This procedure concerns the issuance of an administrative act granted to certify the right to issue a building permit / revision permit and the application, while it is valid, of its urban planning provisions and sizes (construction, coverage, height), which are in force at the time of issuance of the preliminary approval, provided that the building permit / revision permit is issued within the period of validity of the preliminary approval and subject to obtaining and submitting the required approvals provided for in Article 40(1)(b) of Law 4495/2017, during the building permit / revision permit issuance process. |
− | |process_application_owner=Public bodies, Persons
| + | |process_org_owner_is_private=No |
− | |process_application_submission_type=Submitted by the applicant (digital)
| + | |process_org_owner=54032 |
− | |process_application_type=Application
| + | |process_provision_org_owner_directory=968238 |
− | |process_cost_max=20
| + | |process_provision_org_group=1461 |
− | |process_cost_min=20
| + | |process_remarks=The period of validity of the preliminary approval of the revision permit may not exceed the period of validity of the revision permit. By way of exception, if relating to modification of street and building lines or amendment of buildable areas in communal areas, as well as in cases of subsequent inclusion of the area under a cultural heritage or nature protection status, the preliminary approval shall certify the right to build, only at the time of its issue. |
− | |process_deadline_duration=15552000
| + | |process_deadline_duration=P6M |
− | |process_description=The procedure concerns the adoption of an administrative act to certify the right to issue a building permit/exemption licence and the application, at the time of its validity, of its town and town planning provisions (building, coverage, height) in force at the time of issue of the pre-authorisation, provided that the building permit/examination permit is issued within the time of validity of the pre-authorisation and subject to the assurance and submission of the required approvals provided for in paragraph 1 of Article 40 of Law 4495/2017 in the course of the procedure for issuing the building licence/examination licence/authorisation. | + | |process_provided_language=Greek |
− | |process_evidence_alternative_total_number=0 | + | |process_evidence_identification_type=Other |
| + | |process_evidence_identification_type_other=Engineering input codes in the digital services of the Technical Chamber of Commerce of Greece (TEI) |
| + | |process_type=Outgoing |
| + | |process_trigger=Applied for |
| + | |process_trigger_type=Application (digital) |
| + | |process_usage=Supporting document |
| + | |process_output_type=Administrative Act |
| + | |process_validity_duration_set=Defined |
| + | |process_validity_duration=P1Y |
| + | |process_source=EU-GO (support), Framers |
| + | |process_provided_to=Public Bodies,Engineers |
| + | |process_tax_type=Applications,Attestations,Decisions |
| + | |process_life_events=Building permits - engineers |
| + | |process_sdg_resource=Hierarchical appeal/recourse |
| + | |process_sdg_lack_of_response_rule=Other |
| + | |process_sdg_lack_of_response_rule_other=The appeal must be filed within a time limit of thirty (30) days from the notification or otherwise-obtained full knowledge of the act by the applicant by registering it with the City Planning Agency that issued the contested act. |
| + | |process_sdg_notes=Pursuant to Article 23 of Law 4495/17, the Regional Councils for Urban Planning Issues and Disputes review the administrative appeals against enforceable acts or omissions of City Planning Agencies, which are issued during the issuance procedure of the preliminary approvals of building permits. |
| + | |process_total_duration_steps_min=691200 |
| + | |process_total_duration_steps_max=691200 |
| + | |process_cost_min=20.00 |
| + | |process_cost_max=20.00 |
| |process_evidence_cost_guarantee=0 | | |process_evidence_cost_guarantee=0 |
| |process_evidence_cost_total_number=0 | | |process_evidence_cost_total_number=0 |
| |process_evidence_ex_officio_total_number=0 | | |process_evidence_ex_officio_total_number=0 |
− | |process_evidence_identification_type=Other | + | |process_evidence_alternative_total_number=0 |
− | |process_evidence_identification_type_other=Engineering input codes in the digital services of the Technical Chamber of Commerce of Greece (TEI)
| |
| |process_evidence_prerequisite_total_number=0 | | |process_evidence_prerequisite_total_number=0 |
| + | |process_evidence_total_number=5 |
| + | |process_evidence_step_total_number=0 |
| |process_evidence_step_digital_total_number=0 | | |process_evidence_step_digital_total_number=0 |
− | |process_evidence_step_total_number=0 | + | |process_application_type=Application |
− | |process_evidence_total_number=5 | + | |process_application_submission_type=Submitted by the applicant (digital) |
| + | |process_application_owner=Persons, Public bodies |
| + | |process_application_description=Application by the project owner or by the person with a legitimate right, together with the declarations of assignment of undertaking and supervising studies. |
| + | |process_application_note=The application is accompanied by the declaration of assignment of the project owner or of the person with a legitimate right and the declarations of assignment of undertaking and supervising studies of the engineers involved. |
| + | |process_uuid=faec43d5-29e3-4c14-ae07-9c9dbb7f427b |
| |process_id=893653 | | |process_id=893653 |
− | |process_life_events=Building permits - engineers, Urban isuues
| |
− | |process_official_title=Pre-authorisation of a building licence
| |
− | |process_org_owner=54032
| |
− | |process_org_owner_is_private=No
| |
− | |process_output_type=Administrative Act
| |
− | |process_provided_language=Greek
| |
− | |process_provided_to=Public Bodies, Engineers
| |
− | |process_provision_org_group=1461
| |
− | |process_provision_org_owner_directory=968238
| |
− | |process_remarks=The period of validity of the authorisation for a review may not exceed the period of validity of the review authorisation; exceptionally, if it relates to modifications of tariffs and building lines or modification of building sites to public and in cases of subsequent integration of the area into a cultural heritage protection or nature protection scheme, pre-authorisation shall certify the right to build only at the time of its adoption.
| |
− | |process_sdg_lack_of_response_rule=Other
| |
− | |process_sdg_lack_of_response_rule_other=The appeal shall be brought within a period of thirty (30) days of the notification or otherwise full knowledge of the act by the person concerned by depositing it to the Protocol of the Construction Office, which adopted the contested act.
| |
− | |process_sdg_notes=Pursuant to Article 23 of Law 4495/17, Regional Councils of Urban Affairs and Disputes (P.O. Box P.O. Box) are examining the administrative actions against executions or omissions of the institutions of the Ministry of Environment, Public Health, Public Health and Consumer Protection, which are adopted in the procedure for issuing prior authorisations for building permits.
| |
− | |process_sdg_resource=Hierarchical appeal/recourse
| |
− | |process_source=Framers, EU-GO (support)
| |
− | |process_tax_type=Applications, Decisions, Attestations
| |
− | |process_total_duration_steps_max=345600
| |
− | |process_total_duration_steps_min=345600
| |
− | |process_trigger=Applied for
| |
− | |process_trigger_type=Application (digital)
| |
− | |process_type=Outgoing
| |
− | |process_usage=Supporting document
| |
− | |process_uuid=faec43d5-29e3-4c14-ae07-9c9dbb7f427b
| |
− | |process_validity_duration=31104000
| |
| }} | | }} |
| {{process conditions | | {{process conditions |
| + | |process_conditions_num_id=1 |
| |process_conditions_alternative=No | | |process_conditions_alternative=No |
− | |process_conditions_name=The engineers shall be the sole applicants for the authorisation of building permit and shall be required to hold codes in the digital services of the TEI.
| |
− | |process_conditions_num_id=1
| |
| |process_conditions_type=Possession of passwords to enter software | | |process_conditions_type=Possession of passwords to enter software |
| + | |process_conditions_name=Engineers are the sole applicants for the preliminary approval of a building permit and they must hold passwords to the digital services of the Technical Chamber of Greece. |
| |process_conditions_url=https://web.tee.gr/mytee/ | | |process_conditions_url=https://web.tee.gr/mytee/ |
| }} | | }} |
| {{process conditions | | {{process conditions |
| + | |process_conditions_num_id=2 |
| |process_conditions_alternative=No | | |process_conditions_alternative=No |
− | |process_conditions_name=The pre-authorisation procedure for the issue of a building permit is optional and covers each licence category under Article 36 of Law 4495/17.
| |
− | |process_conditions_num_id=2
| |
| |process_conditions_type=Administrative | | |process_conditions_type=Administrative |
| + | |process_conditions_name=The preliminary approval procedure for the issuance of a building permit is optional and concerns all categories of permit issuance of Article 36 of Law 4495/17. |
| + | The procedure for the preliminary approval of a revision permit is optional insofar as it concerns a change in urban planning sizes of coverage, height and volume. Alternatively, the written certification of Article 38(2)(b)(ba) and (bb) of Law 4495/17 is required. |
| }} | | }} |
| {{process conditions | | {{process conditions |
| + | |process_conditions_num_id=3 |
| |process_conditions_alternative=No | | |process_conditions_alternative=No |
− | |process_conditions_name=(a) In buildings with a surface counted on the structure of more than 3,000 m2 and an addition to existing buildings with an overall resulting surface counting on the construction of more than 3,000 sq.m., (b) where a building permit is provided for other services than the Building Service, the construction pre-authorisation is compulsory and is granted by the relevant Ministry for the construction of permanent buildings, works of particular environmental and residential importance or works of special control over the conditions of construction.
| |
− | |process_conditions_num_id=3
| |
| |process_conditions_type=Administrative | | |process_conditions_type=Administrative |
| + | |process_conditions_name=The preliminary approval of a building permit is compulsory in the following cases: |
| + | a) Buildings with a surface area added to the structure of more than 3,000 m2 and additions to existing buildings with a total resulting surface area added to the structure of more than 3,000 m2. |
| + | b) Where a building permit needs to be issued by services other than the City Planning Agency, a preliminary building approval is compulsory and is granted by the competent City Planning Agency. |
| + | c) For the construction of permanent building facilities, projects of particular environmental and residential importance, or projects subject to special inspection as regards building regulations. |
| }} | | }} |
| {{process conditions | | {{process conditions |
| + | |process_conditions_num_id=4 |
| |process_conditions_alternative=No | | |process_conditions_alternative=No |
− | |process_conditions_name=Pre-authorisation is issued exclusively by the Ministry of Finance, unless otherwise provided for in specific provisions. In this case, the topographical chart is checked by the relevant Ministry and transmitted to the department responsible for issuing the approval. For investment projects that have been included in the Strategic Investments in accordance with the relevant legislative framework on strategic investment, as well as for investment projects submitted for evaluation to the Hellenic Investment and External Trade Company SA under the same legislative framework, the approval is issued by the Ministry of Development and Investment's Directorate-General.
| |
− | |process_conditions_num_id=4
| |
| |process_conditions_type=Administrative | | |process_conditions_type=Administrative |
| + | |process_conditions_name=The preliminary approval is issued exclusively by the |
| + | competent City Planning Agency, unless more specific provisions provide otherwise. In this case, the survey diagram will be checked by the competent City Planning Agency and sent to the department responsible for issuing the preliminary approval. Investment plans that have been included in Strategic Investments in accordance with the relevant legislative framework on strategic investments. |
| }} | | }} |
| {{process conditions | | {{process conditions |
| + | |process_conditions_num_id=5 |
| |process_conditions_alternative=No | | |process_conditions_alternative=No |
− | |process_conditions_name=No pre-authorisation is required for investments that have been or fall under Law 3986/2011 (A 152).
| |
− | |process_conditions_num_id=5
| |
| |process_conditions_type=Administrative | | |process_conditions_type=Administrative |
| + | |process_conditions_name=Preliminary approval is not required for investments that have been or are subject to Law 3986/2011 (Government Gazette, Series I, No 152). |
| + | }} |
| + | {{process evidences cost |
| + | |process_evidence_cost_num_id=1 |
| + | |process_evidence_cost_alternative=No |
| + | |process_evidence_cost_type=Impost |
| + | |process_evidence_cost_calculation=One-off |
| + | |process_evidence_cost_description=TCG state fee |
| + | |process_evidence_cost_min=20 |
| + | |process_evidence_cost_max=20 |
| + | |process_evidence_cost_payment_type=Bank cashier, Digital (debit / credit card), Digital (web banking) |
| }} | | }} |
| {{process evidences | | {{process evidences |
| + | |process_evidence_num_id=1 |
| + | |process_evidence_type=5768 |
| + | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
− | |process_evidence_description=Descriptive diagram
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_note=The topographic diagram is dependent on the state coordinate system, in accordance with the applicable specifications, in accordance with Article 39 of Law 4495/2017 "Signature diagram and cover diagram specifications".
| |
− | |process_evidence_num_id=1
| |
− | |process_evidence_owner=Public bodies, Persons
| |
| |process_evidence_submission_type=Submitted by the applicant (digital) | | |process_evidence_submission_type=Submitted by the applicant (digital) |
− | |process_evidence_type=5768 | + | |process_evidence_owner=Persons, Public bodies |
| + | |process_evidence_description=Survey diagram |
| + | |process_evidence_note=The survey diagram is dependent on the State coordinate system, in accordance with the applicable specifications, pursuant to Article 39 of Law 4495/2017 ‘Specifications for preparation of survey diagram and coverage diagram’. |
| }} | | }} |
| {{process evidences | | {{process evidences |
| + | |process_evidence_num_id=2 |
| + | |process_evidence_type=5768 |
| + | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (digital) |
| + | |process_evidence_owner=Persons, Public bodies |
| |process_evidence_description=Coverage diagram, in accordance with the applicable specifications | | |process_evidence_description=Coverage diagram, in accordance with the applicable specifications |
− | |process_evidence_is_under_prerequisite=No
| + | |process_evidence_note=The coverage diagram is prepared in accordance with Article 39 of Law 4495/2017 ‘Specifications for preparation of survey diagram and coverage diagram’. |
− | |process_evidence_note=The coverage diagram shall be drawn up in accordance with Article 39 of Law 4495/2017 "Description specifications for topographical diagram and coverage". | |
− | |process_evidence_num_id=2
| |
− | |process_evidence_owner=Public bodies, Persons
| |
− | |process_evidence_submission_type=Submitted by the applicant (digital)
| |
− | |process_evidence_type=5768
| |
| }} | | }} |
| {{process evidences | | {{process evidences |
| + | |process_evidence_num_id=3 |
| + | |process_evidence_type=2905 |
| + | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
− | |process_evidence_description=Ownership title
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_note=Title of ownership and a recent certificate of ownership, a real estate sheet or an extract from a real estate.
| |
− | |process_evidence_num_id=3
| |
− | |process_evidence_owner=Public bodies, Persons
| |
| |process_evidence_submission_type=Submitted by the applicant (digital) | | |process_evidence_submission_type=Submitted by the applicant (digital) |
− | |process_evidence_type=2905 | + | |process_evidence_owner=Persons, Public bodies |
| + | |process_evidence_description=Title deed |
| + | |process_evidence_note=Title deed and a recent certificate of ownership or a cadastral map or extract of a cadastral map for each property. |
| }} | | }} |
| {{process evidences | | {{process evidences |
| + | |process_evidence_num_id=4 |
| + | |process_evidence_type=2243 |
| + | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
− | |process_evidence_description=Evidence of the legality of the existing buildings
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_note=The legality figures may be issued on a case-by-case basis, engineer attestations in accordance with the provisions of Law 4495/2017, arbitrary claims, etc.
| |
− | |process_evidence_num_id=4
| |
− | |process_evidence_owner=Public bodies, Persons
| |
| |process_evidence_submission_type=Submitted by the applicant (digital) | | |process_evidence_submission_type=Submitted by the applicant (digital) |
− | |process_evidence_type=6866 | + | |process_evidence_owner=Persons, Public bodies |
| + | |process_evidence_description=Proof of legality of existing buildings |
| + | |process_evidence_note=Depending on the case, the proof of legality may be the issued building permits, engineer certificates in accordance with the provisions of Law 4495/2017, subjection to the law on unlawful construction, etc. |
| }} | | }} |
| {{process evidences | | {{process evidences |
| + | |process_evidence_num_id=5 |
| + | |process_evidence_type=1068 |
| + | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (digital) |
| + | |process_evidence_owner=Persons, Public bodies |
| |process_evidence_description=Technical report | | |process_evidence_description=Technical report |
− | |process_evidence_is_under_prerequisite=No
| + | |process_evidence_note=A technical report that describes the project, sizes and uses with precision. |
− | |process_evidence_note=Technical report which accurately describes the work, sizes and uses. | |
− | |process_evidence_num_id=5
| |
− | |process_evidence_owner=Public bodies, Persons
| |
− | |process_evidence_submission_type=Submitted by the applicant (digital)
| |
− | |process_evidence_type=6631
| |
− | }}
| |
− | {{process evidences cost
| |
− | |process_evidence_cost_alternative=No
| |
− | |process_evidence_cost_calculation=One-off
| |
− | |process_evidence_cost_description=Anti-performance fee T.E.
| |
− | |process_evidence_cost_max=20
| |
− | |process_evidence_cost_min=20
| |
− | |process_evidence_cost_num_id=1
| |
− | |process_evidence_cost_type=Impost
| |
− | }}
| |
− | {{process provision digital locations
| |
− | |process_provision_digital_location_title=Electronic issue of building permits
| |
− | |process_provision_digital_location_url=https://web.tee.gr/e-adeies/anakoinoseis/
| |
| }} | | }} |
| {{process rules | | {{process rules |
| + | |process_rule_type=Law |
| |process_rule_decision_number=4495 | | |process_rule_decision_number=4495 |
| |process_rule_decision_year=2017 | | |process_rule_decision_year=2017 |
− | |process_rule_description=Control and protection of the Structured Environment and other provisions | + | |process_rule_description=Control and protection of the Structured Environment and other provisions. |
| + | |process_rule_gazette_doc_number=167 |
| |process_rule_gazette_doc_issue=Α | | |process_rule_gazette_doc_issue=Α |
− | |process_rule_gazette_doc_number=167
| |
− | |process_rule_type=Law
| |
| |process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20170100167 | | |process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20170100167 |
| }} | | }} |
| {{process rules | | {{process rules |
| + | |process_rule_type=Law |
| |process_rule_decision_number=4067 | | |process_rule_decision_number=4067 |
| |process_rule_decision_year=2012 | | |process_rule_decision_year=2012 |
− | |process_rule_description=New Construction Regulation | + | |process_rule_description=New Building Regulation |
| + | |process_rule_gazette_doc_number=79 |
| |process_rule_gazette_doc_issue=Α | | |process_rule_gazette_doc_issue=Α |
− | |process_rule_gazette_doc_number=79
| |
− | |process_rule_type=Law
| |
| |process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20120100079 | | |process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20120100079 |
| }} | | }} |
| {{process rules | | {{process rules |
| + | |process_rule_type=Ministerial Decision |
| |process_rule_decision_number=3046/304/1989 | | |process_rule_decision_number=3046/304/1989 |
| |process_rule_decision_year=1989 | | |process_rule_decision_year=1989 |
| |process_rule_description=Building Regulation | | |process_rule_description=Building Regulation |
| + | |process_rule_gazette_doc_number=59 |
| |process_rule_gazette_doc_issue=Δ | | |process_rule_gazette_doc_issue=Δ |
− | |process_rule_gazette_doc_number=59
| |
− | |process_rule_type=Ministerial Decision
| |
| |process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=19890400059 | | |process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=19890400059 |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=1 |
| + | |process_step_exit=No |
| |process_step_child=No | | |process_step_child=No |
− | |process_step_description=The relevant Building Service of the relevant Municipality shall receive the relevant engineer request through the TEI platform, together with the necessary supporting documents and studies. | + | |process_step_title=Receipt of the application for preliminary approval of a building permit |
− | |process_step_duration_max=86400
| + | |process_step_official=Competent Directorate |
− | |process_step_duration_min=86400
| |
− | |process_step_exit=No | |
| |process_step_implementation=Software action | | |process_step_implementation=Software action |
− | |process_step_num_id=1 | + | |process_step_duration_min=P1D |
− | |process_step_official=Competent Directorate | + | |process_step_duration_max=P1D |
− | |process_step_title=Receipt of the application for prior authorisation of a building permit | + | |process_step_description=The competent City Planning Agency of the local municipality receives the relevant request of the engineer via the platform of the Technical Chamber of Greece, with the necessary supporting documents and designs attached. |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=2 |
| + | |process_step_exit=No |
| |process_step_child=No | | |process_step_child=No |
− | |process_step_description=A competent official of the Municipality's Building Service shall check the completeness of the file. | + | |process_step_title=Checking of dossier completeness |
− | |process_step_duration_max=86400
| + | |process_step_official=Competent Employee |
− | |process_step_duration_min=86400
| |
− | |process_step_exit=No | |
| |process_step_implementation=Software action | | |process_step_implementation=Software action |
− | |process_step_note=If the Ministry finds shortcomings or errors the request administrator shall be informed via the information system in order to make the necessary supplements or corrections within two (2) months, otherwise the application submitted with the attached file shall be filed. | + | |process_step_duration_min=P1D |
− | |process_step_num_id=2
| + | |process_step_duration_max=P1D |
− | |process_step_official=Competent Employee
| + | |process_step_description=The competent employee of the Municipal City Planning Agency checks the completeness of the dossier. |
− | |process_step_title=Folder Fully Control
| + | |process_step_note=If the City Planning Agency finds omissions or errors, the administrator of the application is notified through the information system so that they can make the necessary additions or corrections within a time limit of two (2) months; otherwise, the application submitted with the attached dossier will be closed. |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=3 |
| + | |process_step_exit=No |
| |process_step_child=No | | |process_step_child=No |
− | |process_step_description=The title of property shall be checked for the determination of the completeness, buildability and the time of fragmentation of the plot or field and the topographical chart for compliance with the general and specific urban provisions and specifications, as well as for checking the elements contained therein. | + | |process_step_title=Checking of title deed and survey diagram |
− | |process_step_duration_max=172800
| + | |process_step_official=Competent Employee |
− | |process_step_duration_min=172800
| |
− | |process_step_exit=No | |
| |process_step_implementation=Inspection | | |process_step_implementation=Inspection |
− | |process_step_num_id=3 | + | |process_step_duration_min=P2D |
− | |process_step_official=Competent Employee | + | |process_step_duration_max=P2D |
− | |process_step_title=Control of property title and topographical diagram | + | |process_step_description=The title deed is checked to verify the integrity, buildability and time of segmentation of the plot or parcel of land, and the survey diagram is checked as regards compliance with general and specific urban planning provisions and specifications, as well as verification of the information included therein. |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=4 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_description=Upon approval of the Topographic Chart, the folder shall be promoted to check the Coverage Chart. | + | |process_step_previous_child_selector=3 |
− | |process_step_exit=No | + | |process_step_previous_child=3 |
| + | |process_step_title=Approval of a survey diagram |
| + | |process_step_official=Competent Employee |
| |process_step_implementation=Software action | | |process_step_implementation=Software action |
− | |process_step_num_id=4 | + | |process_step_description=Following approval of the survey diagram, the dossier is forwarded for the purpose of checking the coverage diagram. |
− | |process_step_official=Competent Employee
| |
− | |process_step_previous_child=3
| |
− | |process_step_previous_child_selector=3
| |
− | |process_step_title=Approval of the topographical diagram
| |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=5 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_description=Check the coverage diagram and any relevant parking takeover contribution form required in respect of compliance with the general and specific urban provisions and specifications of the required data, as described in Article 39 of Law 4495/17, as well as evidence of the legality of existing buildings on the plot or field, provided under the responsibility of the engineer. | + | |process_step_previous_child_selector=4 |
− | |process_step_duration_max=518400 | + | |process_step_previous_child=4 |
− | |process_step_duration_min=518400 | + | |process_step_title=Vetting of a coverage diagram |
− | |process_step_exit=No | + | |process_step_official=Competent Employee |
| |process_step_implementation=Inspection | | |process_step_implementation=Inspection |
− | |process_step_note=The verification of the evidence of legality of existing buildings on the plot or land, relates to the identification of the elements contained in the already issued building permits, as well as to any declarations of subordination of arbitrary structures, and is limited to the correct matching of the sizes indicated in the plans of the already issued building permits and to the plans accompanying declarations of subordination of arbitrary laws, as reflected in the cover chart. | + | |process_step_duration_min=P6D |
− | |process_step_num_id=5
| + | |process_step_duration_max=P6D |
− | |process_step_official=Competent Employee
| + | |process_step_description=The coverage diagram and any required relevant contribution form for parking space acquisition are checked with regard to compliance with the general and specific urban planning provisions and the specifications of the required data, described in Article 39 of Law 4495/17, as well as the proof of legality of existing buildings on the plot or parcel, which are produced under the responsibility of the engineer. |
− | |process_step_previous_child=4
| + | |process_step_note=The checking of the proof of the legality of existing buildings on the plot or parcel involves the verification of the information included in the building permits already issued, as well as any declarations for subjection to the law on unlawful construction, and is limited to the correct matching of the sizes indicated in the plans of the building permits already issued and the plans accompanying declarations of subjection to laws on unlawful construction with those shown in the coverage diagram. |
− | |process_step_previous_child_selector=4
| |
− | |process_step_title=Check the coverage diagram
| |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=6 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_exit=No | + | |process_step_previous_child_selector=5 |
| + | |process_step_previous_child=5 |
| + | |process_step_title=Approval of a coverage diagram |
| + | |process_step_official=Competent Employee |
| |process_step_implementation=Software action | | |process_step_implementation=Software action |
− | |process_step_num_id=6
| |
− | |process_step_official=Competent Employee
| |
− | |process_step_previous_child=5
| |
− | |process_step_previous_child_selector=5
| |
− | |process_step_title=Receipt Diagram Approval
| |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=7 |
| + | |process_step_exit=Yes |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_description=The administrative act of pre-authorisation shall be adopted and the necessary studies, authorisations and other supporting documents to be provided for the issue of the building permit shall be established. | + | |process_step_previous_child_selector=6 |
− | |process_step_exit=Yes | + | |process_step_previous_child=6 |
| + | |process_step_title=Issuance of preliminary approval of building permit |
| + | |process_step_official=Competent Employee |
| |process_step_implementation=Software action | | |process_step_implementation=Software action |
− | |process_step_num_id=7 | + | |process_step_description=The administrative act of preliminary approval is issued and the necessary studies, approvals and other supporting documents to be submitted for the issuance of the building permit are determined. |
− | |process_step_official=Competent Employee
| |
− | |process_step_previous_child=6
| |
− | |process_step_previous_child_selector=6
| |
− | |process_step_title=Pre-approved building permit
| |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=8 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_description=In the case of determination by the Ministry of Finance, of deficiencies or errors in the topographic chart, the administrator of the application shall be informed via the information system in order to make the necessary supplements or corrections within two (2) months, otherwise the application with the attached file with the studies and shall be made in the information system file. | + | |process_step_previous_child_selector=3 |
− | |process_step_exit=No
| |
− | |process_step_num_id=8
| |
| |process_step_previous_child=3 | | |process_step_previous_child=3 |
− | |process_step_previous_child_selector=3 | + | |process_step_title=Omissions or errors in a survey diagram |
− | |process_step_title=Deficiencies or errors in the Topographic Chart | + | |process_step_description=If the City Planning Agency finds omissions or errors in the survey diagram, the administrator of the submitted application will be notified through the information system so they can make the necessary additions or corrections within two (2) months; otherwise, the application with the attached dossier with the studies and supporting documents will be closed in the information system. |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=9 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_exit=No | + | |process_step_previous_child_selector=8 |
− | |process_step_note=In the event of errors or deficiencies, the request shall be rejected.
| |
− | |process_step_num_id=9
| |
| |process_step_previous_child=8 | | |process_step_previous_child=8 |
− | |process_step_previous_child_selector=8 | + | |process_step_title=Re-checking of a survey diagram |
− | |process_step_title=Recheck Topographic Chart | + | |process_step_description=In the event of errors or omissions, the application will be rejected. |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=10 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_exit=No | + | |process_step_previous_child_selector=9 |
− | |process_step_num_id=10
| |
| |process_step_previous_child=9 | | |process_step_previous_child=9 |
− | |process_step_previous_child_selector=9
| + | |process_step_title=Approval of a survey diagram |
− | |process_step_title=Approval of the topographical diagram | |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=11 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_exit=No | + | |process_step_previous_child_selector=10 |
− | |process_step_num_id=11
| |
| |process_step_previous_child=10 | | |process_step_previous_child=10 |
− | |process_step_previous_child_selector=10
| + | |process_step_title=Checking of a coverage diagram |
− | |process_step_title=Check Cover Diagram | |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=12 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_description=In the case of determination by the Ministry of Finance of deficiencies or errors in the coverage diagram, the administrator of the application shall be informed via the information system in order to make the necessary supplements or corrections within two (2) months, otherwise the application with the attached file with the studies and shall be placed in the information system file. | + | |process_step_previous_child_selector=11 |
− | |process_step_exit=No
| |
− | |process_step_num_id=12
| |
| |process_step_previous_child=11 | | |process_step_previous_child=11 |
− | |process_step_previous_child_selector=11 | + | |process_step_title=Omissions or errors in the coverage diagram |
− | |process_step_title=Deficiencies or errors in the Coverage Chart | + | |process_step_description=If the City Planning Agency finds omissions or errors in the coverage diagram, the administrator of the submitted application will be notified through the information system so that they can make the necessary additions or corrections within two (2) months; otherwise, the application with its attached dossier of studies and information will be closed in the information system. |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=13 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_description=Checking the corrected/completed coverage diagram | + | |process_step_previous_child_selector=12 |
− | |process_step_duration_max=345600 | + | |process_step_previous_child=12 |
− | |process_step_duration_min=345600 | + | |process_step_title=Re-checking of a coverage diagram |
− | |process_step_exit=No | + | |process_step_official=Competent Employee |
| |process_step_implementation=Inspection | | |process_step_implementation=Inspection |
− | |process_step_note=If the review of the corrected coverage diagram has not made the necessary corrections, the application shall be rejected. | + | |process_step_duration_min=P4D |
− | |process_step_num_id=13
| + | |process_step_duration_max=P4D |
− | |process_step_official=Competent Employee
| + | |process_step_description=The corrected/completed coverage diagram is checked. |
− | |process_step_previous_child=12
| + | |process_step_note=If the necessary corrections have not been made as of the re-checking of the corrected coverage diagram, the application will be rejected. |
− | |process_step_previous_child_selector=12
| |
− | |process_step_title=Recheck Coverage Diagram
| |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=14 |
| + | |process_step_exit=No |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_exit=No | + | |process_step_previous_child_selector=13 |
− | |process_step_num_id=14
| |
| |process_step_previous_child=13 | | |process_step_previous_child=13 |
− | |process_step_previous_child_selector=13
| + | |process_step_title=Approval of a coverage diagram |
− | |process_step_title=Receipt Diagram Approval | |
| }} | | }} |
| {{process steps | | {{process steps |
| + | |process_step_num_id=15 |
| + | |process_step_exit=Yes |
| |process_step_child=Yes | | |process_step_child=Yes |
− | |process_step_exit=Yes | + | |process_step_previous_child_selector=14 |
− | |process_step_num_id=15
| |
| |process_step_previous_child=14 | | |process_step_previous_child=14 |
− | |process_step_previous_child_selector=14 | + | |process_step_title=Issuance of preliminary approval of building permit |
− | |process_step_title=Pre-approved building permit | + | }} |
| + | {{process provision digital locations |
| + | |process_provision_digital_location_title=Electronic issuance of building permits |
| + | |process_provision_digital_location_url=https://web.tee.gr/e-adeies/anakoinoseis/ |
| }} | | }} |