Difference between revisions of "ΔΔ:Issue of Building Permits (e-adeies)"

From National Registry of Administrative Public Services
 
 
(23 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
{{process
 
{{process
|process_alternative_titles=Issue of building permits (e-licences) following pre-authorisation
+
|process_official_title=Issuance of building permits (e-adeies)
|process_application_note=Request by the owner of the project or of the legal right, with declarations of awards and studies.
+
|process_alternative_titles=Issuance of building permits (e-adeies) after preliminary approval, Get a building permit
|process_application_owner=Persons
+
|process_description=Α building permit is required for the performance of any building works that do not fall under small-scale construction works, concerning in particular:
|process_application_related_url=https://web.tee.gr/e-adeies/anakoinoseis/
+
a) construction of, addition to and repair of buildings;
|process_application_submission_type=Submitted by the applicant (digital)
+
 
|process_application_type=Application
+
b) demolition of structures, excluding the cases referred to in paragraph 4;
|process_cost_max=20.0
+
 
|process_cost_min=0.0
+
c) excavation or backfill of plus/minus 0,80 metres, as well as floorings, preparations of plots and parcels for the purpose of building;
|process_description=Οικοδομική άδεια απαιτείται για την εκτέλεση οποιασδήποτε εργασίας δόμησης, η οποία δεν εμπίπτει στις εργασίες δόμησης μικρής κλίμακας και αφορά ιδίως:
+
 
α) ανέγερση, προσθήκη και επισκευή κτιρίων,
+
d) construction of a pool;
β) κατεδάφιση κατασκευών εξαιρούμενων των περιπτώσεων της παραγράφου 4
+
 
γ) εκσκαφές ή επιχώσεις μεγαλύτερες του συν/πλην 0,80 μέτρα, καθώς και επιστρώσεις, διαμορφώσεις οικοπέδων και γηπέδων με σκοπό τη δόμηση,
+
e) a change of use, if there is an adverse change in the data of the coverage diagram or in the design loads of the structural integrity study or a change in mechanical installations with regard to their passages from other floors or communal areas;
δ) κατασκευή πισίνας,
+
 
ε) αλλαγή χρήσης, αν επέρχεται αλλαγή προς το δυσμενέστερο, στα στοιχεία του διαγράμματος κάλυψης ή στα φορτία σχεδιασμού της στατικής μελέτης ή αλλαγή μηχανολογικών εγκαταστάσεων ως προς τις διελεύσεις τους από άλλους ορόφους ή κοινόχρηστους χώρους,
+
f) construction of retaining walls, as well as surrounding walls and fences that are not covered by the small-scale construction works approval;
στ) κατασκευή τοίχων αντιστήριξης, καθώς και περιτοιχίσεων και περιφράξεων που δεν καλύπτονται από την έγκριση εργασιών δόμησης μικρής κλίμακας,
+
 
ζ) κατασκευή υπόγειων δεξαμενών,
+
g) construction of underground tanks;
η) εργασίες τοποθέτησης υπόγειων, προκατασκευασμένων δεξαμενών υγρών και αερίων καυσίμων σε πρατήρια καυσίμων,
+
 
θ) εργασίες της παραγράφου 2 του παρόντος άρθρου, προϋπολογισμού άνω των είκοσι πέντε χιλιάδων (25.000) ευρώ, υπολογιζόμενου σύμφωνα με το Παράρτημα Β΄ του νόμου 4495/2017, ανά οριζόντια η κάθετη ιδιοκτησία με την επιφύλαξη των οριζόμενων στο προτελευταίο εδάφιο αυτής,
+
h) works involving the installation of underground, prefabricated tanks for liquid and gaseous fuels at service stations;
ι) νομιμοποίηση κάθε εκτελεσθείσας εργασίας για την οποία απαιτείται η έκδοση οικοδομικής άδειας.
+
 
(βλ. άρθρο 29 Ν.4495/17 "Διοικητικές πράξεις για την εκτέλεση οικοδομικών εργασιών").
+
i) works referred to in paragraph 2 of this Article, with a budget of over EUR 25,000, calculated in accordance with Annex B to Law 4495/2017, per horizontal or vertical property, without prejudice to the provisions of the penultimate paragraph thereof;
Κατηγορίες τρόπου έκδοσης οικοδομικών αδειών (άρθρο 33 ν.4495/17)
+
 
Ο τρόπος έκδοσης οικοδομικών αδειών κατηγοριοποιείται, ανάλογα με την περιοχή, τη θέση, τη χρήση, το μέγεθος και το περιβαλλοντικό αποτύπωμα του κτιρίου που πρόκειται να ανεγερθεί, ως εξής:
+
j) legalisation of all works carried out, which require issuance of a building permit.
Κατηγορία 1:
+
(see Article 29 of Law 4495/17 ‘Administrative acts for the performance of building works’).
α) ανέγερση ειδικού κτιρίου σε εντός σχεδίου περιοχή, επιφάνειας άνω των χιλίων (1.000) τ.μ. δόμησης και ανέγερση κτιρίου με επικρατούσα χρήση κατοικίας άνω των δύο χιλιάδων (2.000) τ.μ.,
+
Categories of issuance method of building permits (Article 33 of Law 4495/17)
β) ανέγερση ειδικού κτιρίου, σε εκτός σχεδίου περιοχή ή εντός οριοθετημένου, σύμφωνα με το από 24.4.1985 π.δ. (Δ 181), οικισμού ή εντός οικισμού προϋφισταμένου του έτους 1923, με εγκεκριμένα, σύμφωνα με το από 2.3.1981 π.δ. (Δ 138) όρια,
+
The issuance method of building permits falls under different categories, depending on the area, location, use, size and environmental footprint of the building to be constructed, as follows:
γ) ανέγερση κτιρίου με χρήση κατοικίας σε εκτός σχεδίου περιοχή στην οποία δεν υφίσταται κτηματογράφηση ή σε μη άρτιο κατά τον κανόνα γήπεδο,
+
 
δ) προσθήκη δόμησης σε νομίμως υφιστάμενο κτίριο με χρήση ειδικού κτιρίου, εφόσον υπερβαίνει το πενήντα τοις εκατό (50%) της υπάρχουσας δόμησης,
+
Category 1:
ε) κατασκευές και εργασίες σε μνημεία χαρακτηρισμένα από το Υπουργείο Πολιτισμού και Αθλητισμού,
+
 
στ) κατασκευές και εργασίες σε διατηρητέα κτίρια χαρακτηρισμένα από τα Υπουργεία Περιβάλλοντος και Ενέργειας και Πολιτισμού και Αθλητισμού,
+
a) construction of a special building in an area within the city plan with a surface area of more than 1,000 m2 and construction of a building with a predominantly residential use of more than 2,000 m2;
ζ) ανέγερση ή προσθήκη σε οικόπεδα ή γήπεδα εντός προστατευόμενων περιοχών του άρθρου 19 του ν. 1650/1986 (Α 160) ή ζωνών, όπως αρχαιολογικοί χώροι, ιστορικοί τόποι, παραδοσιακοί οικισμοί ή παραδοσιακά τμήματα πόλεως,
+
 
η) ανέγερση ή προσθήκη ή κατασκευές και εργασίες σε οικόπεδα ή γήπεδα, σε επαφή με οριοθετημένα ρέματα,
+
b) construction of a special building, in an area outside the city plan or within a demarcated settlement, in accordance with the Presidential Decree of 24 April 1985 (Government Gazette, Series IV, No 181) or within a settlement in existence since prior to 1923, with approved boundaries, in accordance with the Presidential Decree of 2 March 1981 (Government Gazette, Series IV, No 181);
θ) ανέγερση ή προσθήκη σε οικόπεδα ή γήπεδα και κατασκευές και εργασίες σε οικόπεδα ή γήπεδα σε επαφή με καθορισμένη οριογραμμή αιγιαλού ή παραλίας,
+
 
ι) περιφράξεις γηπέδων με πρόσωπο σε διεθνή, εθνική ή επαρχιακή οδό ή σε ρυμοτομούμενα οικόπεδα,
+
c) construction of a building with residential use in an area outside the city plan where there is no cadastral registration or on land not fit for building according to the regulations;
ια) εργασίες τοποθέτησης υπόγειων, δεξαμενών υγρών και αερίων καυσίμων σε πρατήρια καυσίμων,
+
 
ιβ) εργασίες ανακατασκευής κτιρίων και κτισμάτων εν γένει που εμπίπτουν στο πεδίο εφαρμογής του π.δ. 8.2.1979 (Δ 130), εκτός αν ορίζεται διαφορετικά σε ειδικότερες διατάξεις,
+
d) addition of structure to a legally existing building with a special building use, provided that it exceeds fifty percent (50%) of the existing structures;
ιγ) οποιαδήποτε περίπτωση που δεν ανήκει στις κατηγορίες 2 και 3.
+
 
Κατηγορία 2:
+
e) constructions and works on monuments listed by the Ministry of Culture and Sports;
α) ανέγερση κτιρίου σε οικόπεδο εντός οικισμού προϋφισταμένου του έτους 1923, χωρίς εγκεκριμένα όρια,
+
 
β) νομιμοποιήσεις κτιρίων και κατασκευών και αλλαγών χρήσης του άρθρου 106 ν.4495/17,
+
f) constructions and works on listed buildings according to the Ministries of the Environment and Energy and of Culture and Sports;
γ) ανέγερση ή προσθήκη ή κατασκευές και εργασίες σε οικόπεδα ή γήπεδα, όπου από γενικές ή ειδικές διατάξεις προβλέπεται αυτοψία από την αρμόδια Υπηρεσία Δόμησης (Υ.ΔΟΜ.).
+
 
Κατηγορία 3:
+
g) construction or addition to plots or land within protected areas pursuant to Article 19 of Law 1650/1986 (Government Gazette, Series I, No 160) or zones, such as archaeological sites, historical sites, traditional settlements or traditional parts of the city;
α) ανέγερση κτιρίου σε εντός εγκεκριμένου σχεδίου περιοχή, επιφάνειας έως χίλια (1.000) τ.μ. δόμησης για ειδικά κτίρια και έως δύο χιλιάδες (2.000) τ.μ. δόμησης για κτίρια με επικρατούσα χρήση κατοικίας,
+
 
β) ανέγερση κτιρίου με χρήση κατοικίας σε εκτός σχεδίου περιοχή, στην οποία υφίσταται κτηματογράφηση και εγκεκριμένο Γενικό Πολεοδομικό Σχέδιο (ΓΠΣ) ή Σχέδιο Χωρικής και Οικιστικής Οργάνωσης Ανοικτών Πόλεων (ΣΧΟΟΑΠ) σε άρτιο κατά τον κανόνα,
+
h) construction or addition to or constructions and works on plots or land in contact with demarcated water streams;
γ) ανέγερση κτιρίου σε οικόπεδο εντός οριοθετημένου οικισμού με το από 24.4.1985 π.δ. (Δ 181) για κτίριο με επικρατούσα χρήση κατοικίας,
+
 
δ) προσθήκη δόμησης σε νομίμως υφιστάμενο κτίριο, με χρήση κατοικίας,
+
i) construction or addition to plots or land and constructions and works on plots or land in contact with a demarcated shoreline or coastline;
ε) προσθήκη δόμησης σε νομίμως υφιστάμενο κτίριο, με χρήση ειδικού κτιρίου, εφόσον η προσθήκη δεν υπερβαίνει το πενήντα τοις εκατό (50%) της υπάρχουσας δόμησης, σε εντός και εκτός σχεδίου δόμηση,
+
 
στ) αλλαγές χρήσης κτιρίων ή αυτοτελών οριζόντιων ή κάθετων ιδιοκτησιών που βρίσκονται σε εντός ή εκτός σχεδίου περιοχές,
+
j) fencing of plots of land with a frontage on an international, national or provincial road or plots of land within the city planning zone) works for the installation of underground tanks for liquid and gaseous fuels at service stations;
ζ) κατασκευή πισίνας, εφόσον δεν καλύπτεται από τις περιπτώσεις της έγκρισης εργασιών δόμησης μικρής κλίμακας,
+
 
η) τοίχοι αντιστήριξης, περιτοιχίσεις και περιφράξεις που δεν εμπίπτουν στην κατηγορία εργασιών δόμησης μικρής κλίμακας και με την επιφύλαξη των περιπτώσεων της Κατηγορίας 1,
+
l) works involving the reconstruction of buildings and structures in general, falling within the scope of Presidential Decree of 8.2.1979 (Government Gazette, Series IV, No 130), unless otherwise set out in more specific provisions;
θ) εργασίες τοποθέτησης υπόγειων και προκατασκευασμένων δεξαμενών ύδατος, καθώς και δεξαμενών λυμάτων,
+
 
ι) εργασίες επισκευής και εργασίες αλλαγής διαρρύθμισης νομίμως υφιστάμενων κτιρίων που δεν εμπίπτουν στις περιπτώσεις του άρθρου 30,
+
m) any case which does not fall under Categories 2 and 3.
ια) εργασίες των περιπτώσεων της παρ. 2 του άρθρου 29 για τις οποίες απαιτείται έκδοση οικοδομικής άδειας, σύμφωνα με τον προϋπολογισμό τους,
+
 
ιβ) εργασίες τοποθέτησης υπόγειων, δεξαμενών υγρών και αερίων καυσίμων σε πρατήρια καυσίμων.
+
Category 2:
|process_estimated_implementation_duration=259200
+
 
|process_evidence_alternative_total_number=0
+
a) construction of a building on a plot of land within a settlement in existence since prior to 1923, without approved boundaries;
 +
 
 +
b) legalisations of buildings and structures and changes in use of Article 106 of Law 4495/17;
 +
 
 +
c) construction or addition to or constructions and works on plots or land, where general or specific provisions provide for on-site inspection by the competent City Planning Agency.
 +
 
 +
Category 3:
 +
 
 +
(a) construction of a building in an area within an approved plan with a surface area of no more than 1,000 m2 floor space for special buildings and no more than 2,000 m2 floor space for buildings with a predominantly residential use;
 +
 
 +
b) construction of a building with a residential use in an area outside the city plan where there is cadastral registration and an approved General Urban Plan or a Plan for the Spatial and Residential Organisation of Open Cities on a plot that is fit for building in accordance with the regulations;
 +
 
 +
c) construction of a building on a plot within a demarcated settlement pursuant to the Presidential Decree of 24 April 1985 (Government Gazette, Series IV, No 181) for a building with a predominantly residential use;
 +
 
 +
d) addition of structure to a legally existing building, with a residential use;
 +
 
 +
e) addition of structure to a legally existing building with a special use, provided that the addition does not exceed fifty percent (50%) of the existing structures, inside and outside the city plan;
 +
 
 +
f) changes in the use of buildings or independent horizontal or vertical properties located in areas inside or outside the plan;
 +
 
 +
g) construction of a pool, provided it is not covered by the cases of approval of small-scale construction works;
 +
 
 +
h) retaining walls, surrounding walls and fences that do not fall under the category of small-scale construction works, without prejudice to Category 1 cases;
 +
 
 +
i) installation works for underground and prefabricated water tanks and sewage tanks;
 +
j) repair works and works to change the layout of lawfully existing buildings which do not fall under the cases referred to in Article 30;
 +
 
 +
 
 +
k) works of the cases of Article 29(2) for which a building permit must be issued in accordance with their budget;
 +
 
 +
l) works for the installation of underground tanks for liquid and gaseous fuels at service stations.
 +
|process_org_owner_is_private=No
 +
|process_org_owner=54032
 +
|process_provision_org_owner_directory=968238
 +
|process_provision_org_group=1461
 +
|process_provision_org_directory=Technical Chamber
 +
|process_remarks=*Engineers, with their personal access codes to My TEE, can issue and manage administrative acts for the performance of construction works (approvals, permits, revisions).
 +
*The competent bodies for the issuing of administrative acts relating to the performance of building works are the City Planning Agencies of municipalities, unless specific provisions provide otherwise (see Article 31(1) of Law 4495/17).
 +
*The procedure for submitting, checking and issuing the acts for the performance of building works pursuant to Article 28 is carried out exclusively online via the electronic platform of the Technical Chamber of Greece.
 +
* If the electronic submission information system is not functioning, the application for an administrative act must be submitted with an attached file containing the necessary supporting documents, in hard copy, to the Points of Single Contact (KEP), and is duly forwarded to the City Planning Agency.
 +
Article 38 of Law 4495/17 Procedure for checking of a building permit:
 +
a) Permits falling under the issuance method of Categories 1, 2 and 3 with the preliminary approval of Article 36 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, provided for in Article 40.
 +
*The number of the building permit issued electronically shall be posted online without delay and construction works may commence, with a dossier containing the necessary supporting documents attached, in hard copy, to the Points of Single Contact (KEP), and is duly forwarded to the City Planning Agency.
 +
Article 38 of Law 4495/17 Procedure for checking of a building permit:
 +
a) permits falling under the issuance method of Categories 1, 2 and 3 with the preliminary approval of Article 36 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, provided for in Article 40.
 +
*The building permit number issued electronically shall be posted online without delay and construction works may commence.
 +
|process_estimated_implementation_duration_max=P3D
 +
|process_provided_language=Greek
 +
|process_evidence_identification_type=Other
 +
|process_evidence_identification_type_other=Entrance with TE Codes
 +
|process_type=Outgoing
 +
|process_trigger=Applied for
 +
|process_trigger_type=Application (digital)
 +
|process_usage=Digital supporting Document
 +
|process_output_type=Digital document production
 +
|process_validity_duration_set=Defined
 +
|process_validity_duration=P4Y
 +
|process_source=EU-GO (support), gov.gr, SDG
 +
|process_provided_to=Public Bodies,Engineers
 +
|process_life_events=Licences and compliance,Building permits - engineers
 +
|process_sdg_resource=Hierarchical appeal/recourse
 +
|process_sdg_notes=The above appeal must be filed within a deadline of thirty (30) days from the notification or otherwise full knowledge of the act by the interested party with its submission to the protocol office of the City Planning Agency that issued the contested act.
 +
Pursuant to Article 26 of Law 4495/2017, the Regional Councils for Urban Planning Issues and Disputes review the administrative appeals against enforceable acts or omissions of City Planning Agencies, which are issued during the issuance procedure of building permits.
 +
|process_total_duration_steps_min=1
 +
|process_total_duration_steps_max=1
 +
|process_total_duration_steps_digital_min=1
 +
|process_total_duration_steps_digital_max=1
 +
|process_cost_min=10.00
 +
|process_cost_max=20.00
 
|process_evidence_cost_guarantee=0
 
|process_evidence_cost_guarantee=0
 
|process_evidence_cost_total_number=0
 
|process_evidence_cost_total_number=0
 
|process_evidence_ex_officio_total_number=0
 
|process_evidence_ex_officio_total_number=0
|process_evidence_identification_type=Other
+
|process_evidence_alternative_total_number=0
|process_evidence_identification_type_other=Entrance with TE Codes
 
 
|process_evidence_prerequisite_total_number=8
 
|process_evidence_prerequisite_total_number=8
 +
|process_evidence_total_number=10
 +
|process_evidence_step_total_number=0
 
|process_evidence_step_digital_total_number=0
 
|process_evidence_step_digital_total_number=0
|process_evidence_step_total_number=0
+
|process_govgr_codes=15500
|process_evidence_total_number=10
+
|process_govgr_full_info=15500
 +
|process_application_type=Application
 +
|process_application_submission_type=Submitted by the applicant (digital)
 +
|process_application_owner=Persons
 +
|process_application_description=Application by the owner or by the person with a legitimate right together with the declarations of assignment - undertaking
 +
|process_application_related_url=https://web.tee.gr/e-adeies/anakoinoseis/
 +
|process_application_note=The declaration of assignment is made by the owner or the person with a legitimate right to the engineer of their choice in each case.
 +
The declaration of undertaking is made by the corresponding engineer.
 +
see Article 40(1.a), Law 4495/17
 +
|process_uuid=35c51f49-8a97-4971-a9c1-2f72a9089939
 
|process_id=344883
 
|process_id=344883
 +
|process_estimated_implementation_duration=259200
 
|process_interval=Requested
 
|process_interval=Requested
|process_life_events=Licences and compliance, Building permits - engineers
 
|process_official_title=Issue of a building permit with pre-authorisation
 
|process_org_owner=54032
 
|process_org_owner_is_private=No
 
|process_output_type=Digital document production
 
|process_provided_language=Greek
 
|process_provided_to=Public Bodies, Engineers
 
|process_provision_org_directory=Chamber of Technical Chamber
 
|process_provision_org_group=1461
 
|process_provision_org_owner_directory=968238
 
|process_remarks=Engineers, with their personal access codes at the My TEE may issue and manage administrative works of construction (authorisations, authorisations, revisions). Competent bodies responsible for the administration of administrative acts relating to the execution of construction work are the Building Services of the Municipalities, unless otherwise specified (see Article 31 §1 n.4495/17). The procedure for the submission, verification and adoption of the operations referred to in Article 28, is conducted electronically through the electronic platform of the Technical Chamber of Greece. In case of failure to operate the electronic submission system, the application for an administrative act is submitted in an attached file with the necessary supporting documents, in paper form to the Centres for Citizen Service (C.E.) which are carried out electronically through the electronic platform of the Technical Chamber of Greece. In case of non-operation of the Information System of Electronics, the application for an administrative act is submitted with the necessary documentation, in a form in the form of the CITs (C.E.E.E.) and is sent directly to the IDA. Article 38 n.
 
|process_sdg_notes=The above appeal shall be brought within an exclusive period of thirty (30) days from the notification or otherwise full knowledge of the act by the person concerned by depositing it in the Protocol of the Building Office, which adopted the contested act. In accordance with Article 26 of Law 4495/2017 the Regional Councils of Urban Affairs and Disputes (PRC).
 
|process_sdg_resource=Hierarchical appeal/recourse
 
|process_source=EU-GO (support), gov.gr, SDG
 
|process_total_duration_steps_digital_max=518400
 
|process_total_duration_steps_digital_min=0
 
|process_total_duration_steps_max=1
 
|process_total_duration_steps_min=1
 
|process_trigger=Applied for
 
|process_trigger_type=Application (digital)
 
|process_type=Outgoing
 
|process_usage=Digital supporting Document
 
|process_uuid=35c51f49-8a97-4971-a9c1-2f72a9089939
 
|process_validity_duration=124416000
 
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=1
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
|process_conditions_name=The engineers shall be the sole applicants for the authorisation of building permit and shall be required to hold codes in the digital services of the TEI.
 
|process_conditions_num_id=1
 
 
|process_conditions_type=Possession of passwords to enter software
 
|process_conditions_type=Possession of passwords to enter software
 +
|process_conditions_name=Engineers are the sole applicants for the preliminary approval of a building permit and they must hold passwords to the digital services of the Technical Chamber of Greece.
 
|process_conditions_url=https://web.tee.gr/e-adeies/kodikoi-prosvasis/
 
|process_conditions_url=https://web.tee.gr/e-adeies/kodikoi-prosvasis/
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=2
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
|process_conditions_name=Pre-authorisation of building permit
 
|process_conditions_num_id=2
 
 
|process_conditions_type=Urban planning
 
|process_conditions_type=Urban planning
 +
|process_conditions_name=Preliminary approval of a building permit
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=3
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
|process_conditions_name=In the following cases, construction permits are required (Article 35 n.4495/17): (a) In newly built buildings with a surface counted on the building of more than three thousand (3,000 square meters) and in existing buildings with an overall resulting surface counted on the construction of more than three thousand (3,000 square meters), (b) where a building licence is provided for other services than the Building Service (HSM), the construction approval is compulsory and is granted by the Ministry of Transport, (c) for the construction of permanent buildings, of special environmental and residential projects or works of special control to the conditions of construction, as well as in buildings of more than three thousand (3,000 square meters) of land.
 
|process_conditions_num_id=3
 
 
|process_conditions_type=Urban planning
 
|process_conditions_type=Urban planning
 +
|process_conditions_name=In the following cases, the preliminary approval of a building permit is mandatory (Article 35 of Law 4495/17):
 +
a) In newly-erected buildings with a surface area calculated to the floor space of more than 3,000 m2 and additions to existing buildings with a total resulting surface area calculated to the floor space of more than 3,000 m2.
 +
b) where a building permit needs to be issued by services other than the City Planning Agency, a preliminary building approval is compulsory and is granted by the competent City Planning Agency.
 +
c) for the construction of permanent building facilities, projects of particular environmental and residential importance, or projects subject to special inspection as regards building regulations, as well as in cases of buildings with a surface area of more than 3,000 m2.
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=4
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
|process_conditions_name=Article 35 n.4495/17 For investment projects that have been included in the Strategic Investments in accordance with the relevant legislative framework on strategic investment, as well as investment projects submitted for evaluation to the Hellenic Investment Company and Foreign Trade S.A. under the same legislative framework, a pre-authorisation is required by the Directorate-General for Strategic Investments of the Ministry of Development and Investment.
 
|process_conditions_num_id=4
 
 
|process_conditions_type=Urban planning
 
|process_conditions_type=Urban planning
 +
|process_conditions_name=Article 35 of Law 4495/17 For investment plans that have been included in Strategic Investments in accordance with the relevant legislative framework on strategic investments, as well as for investment projects submitted for assessment to ‘Enterprise Greece Invest & Trade S.A.’ in application of the same legislative framework as above, a preliminary approval must be issued by the Directorate-General for Strategic Investments of the Ministry of Development and Investments.
 +
}}
 +
{{process evidences cost
 +
|process_evidence_cost_num_id=1
 +
|process_evidence_cost_alternative=No
 +
|process_evidence_cost_type=Impost
 +
|process_evidence_cost_calculation=One-off
 +
|process_evidence_cost_description=TCG state fee
 +
|process_evidence_cost_min=10
 +
|process_evidence_cost_max=20
 +
|process_evidence_cost_payment_type=Bank cashier, Digital (debit / credit card), Digital (web banking)
 
}}
 
}}
 
{{process evidences
 
{{process evidences
|process_evidence_alternative=No
+
|process_evidence_num_id=1
|process_evidence_description=Approvals to other services and administrative bodies, where necessary.
+
|process_evidence_type=8880
 
|process_evidence_is_under_prerequisite=Yes
 
|process_evidence_is_under_prerequisite=Yes
|process_evidence_note=See Article 40 n.4495/17 §1.b.
 
|process_evidence_num_id=1
 
|process_evidence_owner=Persons
 
 
|process_evidence_prerequisite=Building, Environmental, Urban planning
 
|process_evidence_prerequisite=Building, Environmental, Urban planning
 +
|process_evidence_alternative=No
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
|process_evidence_type=8880
+
|process_evidence_owner=Persons
 +
|process_evidence_description=Αpplication by the owner or by the person with a legitimate right together with the declarations of assignment - undertaking.
 +
|process_evidence_note=See Article 40 of Law 4495/17 §1.b.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=2
 +
|process_evidence_type=2905
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Title of ownership, a recent certificate of ownership or a real estate sheet and an extract from a census for each property.
 
|process_evidence_description=Title of ownership, a recent certificate of ownership or a real estate sheet and an extract from a census for each property.
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.c.
|process_evidence_note=See Article 40 n.4495/17 §1.c.
 
|process_evidence_num_id=2
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=2905
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
|process_evidence_alternative=No
+
|process_evidence_num_id=3
|process_evidence_description=Evidence of the legality of any existing buildings
+
|process_evidence_type=3798
 
|process_evidence_is_under_prerequisite=Yes
 
|process_evidence_is_under_prerequisite=Yes
|process_evidence_note=See Section 40 n.4495/17 §1.d.
 
|process_evidence_num_id=3
 
|process_evidence_owner=Persons
 
 
|process_evidence_prerequisite=Building, Urban planning
 
|process_evidence_prerequisite=Building, Urban planning
 +
|process_evidence_alternative=No
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
|process_evidence_type=3798
+
|process_evidence_owner=Persons
 +
|process_evidence_description=Evidence of the legality of any existing buildings
 +
|process_evidence_note=See Section 40 of Law 4495/17 §1.d.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=4
 +
|process_evidence_type=3879
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Architectural study, including passive fire protection study and accessibility study for disabled persons, where appropriate
 
|process_evidence_description=Architectural study, including passive fire protection study and accessibility study for disabled persons, where appropriate
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.e
|process_evidence_note=See Article 40 n.4495/17 §1.e
 
|process_evidence_num_id=4
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=5
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Static study
 
|process_evidence_description=Static study
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.f
|process_evidence_note=See Article 40 n.4495/17 §1.f
 
|process_evidence_num_id=5
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
|process_evidence_alternative=No
+
|process_evidence_num_id=6
|process_evidence_description=Electromechanical installations studies
+
|process_evidence_type=5280
 
|process_evidence_is_under_prerequisite=Yes
 
|process_evidence_is_under_prerequisite=Yes
|process_evidence_note=See Article 40 n.4495/17 §1.g
 
|process_evidence_num_id=6
 
|process_evidence_owner=Persons
 
 
|process_evidence_prerequisite=Building, Environmental
 
|process_evidence_prerequisite=Building, Environmental
 +
|process_evidence_alternative=No
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
|process_evidence_type=5768
+
|process_evidence_owner=Persons
 +
|process_evidence_description=Electromechanical installations studies
 +
|process_evidence_note=See Article 40 of Law 4495/17 §1.g
 
}}
 
}}
 
{{process evidences
 
{{process evidences
|process_evidence_alternative=No
+
|process_evidence_num_id=7
|process_evidence_description=Building energy efficiency study
+
|process_evidence_type=5768
 
|process_evidence_is_under_prerequisite=Yes
 
|process_evidence_is_under_prerequisite=Yes
|process_evidence_note=See article 40 n.4495/17 §1.The building permit required for the construction of each building, newly rejuvenated or renovated radically, with a total surface over 50 (50) sq.m., is otherwise submitted with a thermonuclear adequacy study in accordance with the applicable institutional framework.
 
|process_evidence_num_id=7
 
|process_evidence_owner=Persons
 
 
|process_evidence_prerequisite=Building
 
|process_evidence_prerequisite=Building
 +
|process_evidence_alternative=No
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
|process_evidence_type=5768
+
|process_evidence_owner=Persons
 +
|process_evidence_description=Building energy efficiency study
 +
|process_evidence_note=See article 40 of Law 4495/17 §1.The building permit required for the construction of each building, newly rejuvenated or renovated radically, with a total surface over 50 (50) sq.m., is otherwise submitted with a thermonuclear adequacy study in accordance with the applicable institutional framework.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=8
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Planning period study for project execution
 
|process_evidence_description=Planning period study for project execution
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.i
|process_evidence_note=See Article 40 n.4495/17 §1.i
 
|process_evidence_num_id=8
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=9
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Study of plumbing and sewerage
 
|process_evidence_description=Study of plumbing and sewerage
|process_evidence_is_under_prerequisite=No
 
 
|process_evidence_note=See Art. 40 (4495/17)
 
|process_evidence_note=See Art. 40 (4495/17)
|process_evidence_num_id=9
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=10
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Building
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=An active fire protection study, in accordance with the applicable provisions on fire protection, drawn up on the basis of a passive fire protection study, where necessary.
 
|process_evidence_description=An active fire protection study, in accordance with the applicable provisions on fire protection, drawn up on the basis of a passive fire protection study, where necessary.
|process_evidence_is_under_prerequisite=Yes
 
 
|process_evidence_note=See Art. 40 (4495/17)
 
|process_evidence_note=See Art. 40 (4495/17)
|process_evidence_num_id=10
 
|process_evidence_owner=Persons
 
|process_evidence_prerequisite=Building
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=11
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Building
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Gas fuel study approved by the competent gas supply company.
 
|process_evidence_description=Gas fuel study approved by the competent gas supply company.
|process_evidence_is_under_prerequisite=Yes
 
 
|process_evidence_note=It concerns cases where gas fuel is used.
 
|process_evidence_note=It concerns cases where gas fuel is used.
|process_evidence_num_id=11
 
|process_evidence_owner=Persons
 
|process_evidence_prerequisite=Building
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=12
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
|process_evidence_description=Drawing and Health Folder of the project (S.A. and F.A.S.) where required in accordance with the provisions of No. 305/1996 (A.212).
+
|process_evidence_submission_type=Submitted by the applicant (digital)
|process_evidence_is_under_prerequisite=No
 
|process_evidence_note=See Article 40 n.4495/17 §1.m
 
|process_evidence_num_id=12
 
 
|process_evidence_owner=Persons
 
|process_evidence_owner=Persons
|process_evidence_submission_type=Submitted by the applicant (digital)
+
|process_evidence_description=Drawing and Health Folder of the project (S.A. and F.A.S.) where required in accordance with the provisions of Law 305/1996 (A.212).
|process_evidence_type=5768
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.m
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=13
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Waste Management Plan (ATA)
 
|process_evidence_description=Waste Management Plan (ATA)
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=See references to Article 40 of Law 4495/17 §1.d Data on waste management (LPD) are provided by at least the information provided in Article 7(2) under Article 36259/1757/E103/2010 of Decision (B.1312), which are accompanied by a copy of the signed contract of the Management of Excavations, Construction and Demolition (LPD) waste management (LPD) contract with an approved alternative management system (LPD) AEK or a decision approving the signed individual Alternative Management System (LPD) by the Board of Directors (LPD) of the Greek Recycling Organisation (LPD). For regional units where there is no approved Alternate Management System (LPDN) AEK, instead of the copy of the signed contract, a declaration by the AEKKK administration is required to ensure the management of the established AKKC and for the cooperation of the LPD in any phase of the implementation of its operations.
|process_evidence_note=See references to Article 40 n.4495/17 §1.d Data on waste management (LPD) are provided by at least the information provided in Article 7(2) under Article 36259/1757/E103/2010 of Decision (B.1312), which are accompanied by a copy of the signed contract of the Management of Excavations, Construction and Demolition (LPD) waste management (LPD) contract with an approved alternative management system (LPD) AEK or a decision approving the signed individual Alternative Management System (LPD) by the Board of Directors (LPD) of the Greek Recycling Organisation (LPD). For regional units where there is no approved Alternate Management System (LPDN) AEK, instead of the copy of the signed contract, a declaration by the AEKKK administration is required to ensure the management of the established AKKC and for the cooperation of the LPD in any phase of the implementation of its operations.
 
|process_evidence_num_id=13
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
|process_evidence_alternative=No
+
|process_evidence_num_id=14
|process_evidence_description=Symbolic declaration of planned parking areas.
+
|process_evidence_type=3139
 
|process_evidence_is_under_prerequisite=Yes
 
|process_evidence_is_under_prerequisite=Yes
|process_evidence_note=See references to Article 40 n.4495/17 §1.o Where a notarial declaration of parking is required in accordance with Article 1 of Law No 1221/1981 (A 292), and a certificate of registration in the mortgage office or registering it in the office. In the event of acquisition, a proof of payment of the required contribution is submitted instead of a notarial statement.
 
|process_evidence_num_id=14
 
|process_evidence_owner=Persons
 
 
|process_evidence_prerequisite=Building, Urban planning
 
|process_evidence_prerequisite=Building, Urban planning
 +
|process_evidence_alternative=No
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
|process_evidence_type=3139
+
|process_evidence_owner=Persons
 +
|process_evidence_description=Symbolic declaration of planned parking areas.
 +
|process_evidence_note=See references to Article 40 of Law 4495/17 §1.o Where a notarial declaration of parking is required in accordance with Article 1 of Law 1221/1981 (A 292), and a certificate of registration in the mortgage office or registering it in the office. In the event of acquisition, a proof of payment of the required contribution is submitted instead of a notarial statement.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=15
 +
|process_evidence_type=5768
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Reasoned report
 
|process_evidence_description=Reasoned report
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=Relative report of Article 3(1) of Law 1577/1985 (A 210)
|process_evidence_note=Relative report of Article 3(1) of Law No 1577/1985 (A 210)
 
|process_evidence_num_id=15
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=5768
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=16
 +
|process_evidence_type=7053
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Providing evidence of the required contributions from the owner of the project in favour of the State, e-ECA and the relevant municipality.
 
|process_evidence_description=Providing evidence of the required contributions from the owner of the project in favour of the State, e-ECA and the relevant municipality.
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.g
|process_evidence_note=See Article 40 n.4495/17 §1.g
 
|process_evidence_num_id=16
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=7053
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=17
 +
|process_evidence_type=7053
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=A copy of proof of service or an invoice relating to the payment of the agreed remuneration of the engineers, as well as the Engineer Income Tax (VAT) thereof.
 
|process_evidence_description=A copy of proof of service or an invoice relating to the payment of the agreed remuneration of the engineers, as well as the Engineer Income Tax (VAT) thereof.
|process_evidence_is_under_prerequisite=No
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.h.
|process_evidence_note=See Article 40 n.4495/17 §1.h.
 
|process_evidence_num_id=17
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=7053
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=18
 +
|process_evidence_type=7053
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Building, Urban planning
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 
|process_evidence_description=Submission of the relevant contribution form in case of redemption.
 
|process_evidence_description=Submission of the relevant contribution form in case of redemption.
|process_evidence_is_under_prerequisite=Yes
+
|process_evidence_note=See Article 40 of Law 4495/17 §1.c.
|process_evidence_note=See Article 40 n.4495/17 §1.c.
 
|process_evidence_num_id=18
 
|process_evidence_prerequisite=Building, Urban planning
 
|process_evidence_type=7053
 
}}
 
{{process evidences cost
 
|process_evidence_cost_alternative=No
 
|process_evidence_cost_calculation=One-off
 
|process_evidence_cost_description=Anti-performance fee T.E.
 
|process_evidence_cost_max=20
 
|process_evidence_cost_num_id=1
 
|process_evidence_cost_type=Impost
 
}}
 
{{process provision digital locations
 
|process_provision_digital_location_title=Entrance to the system for issuing electronic permits
 
|process_provision_digital_location_url=https://web.tee.gr/e-adeies/anakoinoseis/
 
}}
 
{{process provision digital locations
 
|process_provision_digital_location_title=Gov.gr
 
|process_provision_digital_location_url=https://www.gov.gr/ipiresies/epikheirematike-drasterioteta/adeiodoteseis-kai-summorphose/ekdose-oikodomikon-adeion-e-adeies
 
 
}}
 
}}
 
{{process rules
 
{{process rules
|process_rule_article=28-51
+
|process_rule_type=Law
 
|process_rule_decision_number=4495
 
|process_rule_decision_number=4495
 
|process_rule_decision_year=2017
 
|process_rule_decision_year=2017
|process_rule_description=SUBPART B - ADMINISTRATIVE EXPENDITURE OF ORIGINAL INVESTIGATION AND CONTROL PROCEDURES - CATEGORIES OF LIABILITIES
+
|process_rule_article=28-51
 +
|process_rule_description=PART B – BUILDING FRAMEWORK
 +
CHAPTER ONE
 +
PROCEDURE FOR THE ISSUANCE AND CHECKING OF BUILDING PERMITS – CATEGORIES OF PERMITS
 +
|process_rule_gazette_doc_number=167
 
|process_rule_gazette_doc_issue=Α
 
|process_rule_gazette_doc_issue=Α
|process_rule_gazette_doc_number=167
 
|process_rule_type=Law
 
 
}}
 
}}
 
{{process rules
 
{{process rules
 +
|process_rule_type=Law
 
|process_rule_decision_number=4067
 
|process_rule_decision_number=4067
 
|process_rule_decision_year=2012
 
|process_rule_decision_year=2012
|process_rule_description=New Construction Regulation
+
|process_rule_description=New Building Regulation.
 +
|process_rule_gazette_doc_number=79
 
|process_rule_gazette_doc_issue=Α
 
|process_rule_gazette_doc_issue=Α
|process_rule_gazette_doc_number=79
 
|process_rule_type=Law
 
 
}}
 
}}
 
{{process rules
 
{{process rules
 +
|process_rule_type=Ministerial Decision
 
|process_rule_decision_number=3046/304
 
|process_rule_decision_number=3046/304
 
|process_rule_decision_year=1989
 
|process_rule_decision_year=1989
 
|process_rule_description=Building Regulation
 
|process_rule_description=Building Regulation
 +
|process_rule_gazette_doc_number=59
 
|process_rule_gazette_doc_issue=Δ
 
|process_rule_gazette_doc_issue=Δ
|process_rule_gazette_doc_number=59
 
|process_rule_type=Ministerial Decision
 
 
}}
 
}}
 
{{process steps digital
 
{{process steps digital
 +
|process_step_digital_num_id=1
 +
|process_step_digital_exit=No
 
|process_step_digital_child=No
 
|process_step_digital_child=No
 +
|process_step_digital_title=Authorised engineer’s entry to the TCG website
 +
|process_step_digital_official=Third entity software
 
|process_step_digital_co_org=11197
 
|process_step_digital_co_org=11197
|process_step_digital_description=Entry into the electronic issuing system by the authorised engineer.
 
|process_step_digital_exit=No
 
 
|process_step_digital_implementation=Data input in software
 
|process_step_digital_implementation=Data input in software
|process_step_digital_num_id=1
 
|process_step_digital_official=Third entity software
 
|process_step_digital_title=Enrolment of Authorised Engineer on the TEI website
 
 
|process_step_digital_url=https://web.tee.gr/e-adeies/anakoinoseis/
 
|process_step_digital_url=https://web.tee.gr/e-adeies/anakoinoseis/
 +
|process_step_digital_description=Αccess to the electronic permit system by the authorized engineer.
 
}}
 
}}
 
{{process steps digital
 
{{process steps digital
 +
|process_step_digital_num_id=2
 +
|process_step_digital_exit=No
 
|process_step_digital_child=No
 
|process_step_digital_child=No
 +
|process_step_digital_title=Application for a permit with preliminary approval
 +
|process_step_digital_official=Third entity software
 
|process_step_digital_co_org=11197
 
|process_step_digital_co_org=11197
|process_step_digital_description=Licences falling under the method of issuing Categories 1, 2 and 3 by pre-authorisation under Article 36 n.4495/17 shall be automatically issued after the electronic submission of the dossier with the necessary supporting documents and the necessary studies, as provided for in Article 40 of Law 4495/17, by means of the electronic system of the TEU.
 
|process_step_digital_exit=No
 
 
|process_step_digital_implementation=Data input in software
 
|process_step_digital_implementation=Data input in software
|process_step_digital_num_id=2
+
|process_step_digital_description=Permits falling under the method of issuance of Categories 1, 2 and 3 with the preliminary approval of Article 36 of Law 4495/17 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, as provided for in Article 40 of Law 4495/17, through the electronic system of the TCG.
|process_step_digital_official=Third entity software
 
|process_step_digital_title=Application for a pre-authorised authorisation
 
 
}}
 
}}
 
{{process steps digital
 
{{process steps digital
 +
|process_step_digital_num_id=3
 +
|process_step_digital_exit=No
 
|process_step_digital_child=No
 
|process_step_digital_child=No
 +
|process_step_digital_title=Entry of the required designs and supporting documents into the system
 +
|process_step_digital_official=Third entity software
 
|process_step_digital_co_org=11197
 
|process_step_digital_co_org=11197
|process_step_digital_description=Licences falling under the method of issuing Categories 1, 2 and 3 by pre-authorisation under Article 36 n.4495/17 shall be automatically issued after the electronic submission of the dossier with the necessary supporting documents and the necessary studies, as provided for in Article 40 of Law 4495/17, by means of the electronic system of the TEU.
 
|process_step_digital_exit=No
 
 
|process_step_digital_implementation=Data input in software
 
|process_step_digital_implementation=Data input in software
|process_step_digital_num_id=3
+
|process_step_digital_description=Permits falling under the method of issuance of Categories 1, 2 and 3 with the preliminary approval of Article 36 of Law 4495/17 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, as provided for in Article 40 of Law 4495/17, through the electronic system of the Technical Chamber of Greece.
|process_step_digital_official=Third entity software
 
|process_step_digital_title=Introduction to the system of required studies and supporting documents
 
 
}}
 
}}
 
{{process steps digital
 
{{process steps digital
 +
|process_step_digital_num_id=4
 +
|process_step_digital_exit=No
 
|process_step_digital_child=No
 
|process_step_digital_child=No
 +
|process_step_digital_title=Completion of procedure & issuance of building permit
 +
|process_step_digital_official=Third entity software
 
|process_step_digital_co_org=11197
 
|process_step_digital_co_org=11197
|process_step_digital_description=The number of building permits issued electronically shall be posted on the Internet without delay and may start construction work; these checks shall be carried out within three (3) working days from the date of submission of the dossier.
 
|process_step_digital_duration_max=259200
 
|process_step_digital_exit=No
 
 
|process_step_digital_implementation=Software action
 
|process_step_digital_implementation=Software action
|process_step_digital_num_id=4
+
|process_step_digital_duration_max=P3D
|process_step_digital_official=Third entity software
+
|process_step_digital_description=The building permit number issued electronically shall be posted online without delay and construction works may commence. The above checks shall be carried out within three (3) working days of the date of submission of the dossier.
|process_step_digital_title=Completion of the procedure & issue of a building licence
 
 
}}
 
}}
 
{{process steps digital
 
{{process steps digital
 +
|process_step_digital_num_id=5
 +
|process_step_digital_exit=No
 
|process_step_digital_child=No
 
|process_step_digital_child=No
 +
|process_step_digital_title=Project budget audit.
 +
|process_step_digital_official=Entity software that performs the service
 
|process_step_digital_co_org=11197
 
|process_step_digital_co_org=11197
|process_step_digital_description=Within three (3) days of the issue of the building licence, the Ministry of Finance has carried out an audit of the required contributions and reservations for the public, municipality, e-ECA, including control of the project's budget, until the possibility of automatic control of the project's budget by the information system (Article 38 §6 §4495/17).
 
|process_step_digital_duration_max=259200
 
|process_step_digital_exit=No
 
 
|process_step_digital_implementation=Software action
 
|process_step_digital_implementation=Software action
|process_step_digital_num_id=5
+
|process_step_digital_duration_max=P3D
|process_step_digital_official=Entity software that performs the service
+
|process_step_digital_description=Within a period of three (3) days from the issuance of the building permit, the City Planning Agency checks the required contributions and deductions of the project in favour of the State, municipality, e-EFKA, including the project budget audit, until the possibility of the automatic audit of the project budget by the IT system is activated (Article 38(6) of Law 4495/17).
|process_step_digital_title=Budgetary control of the project
+
}}
 +
{{process provision digital locations
 +
|process_provision_digital_location_title=Entry into the electronic permits issuance system
 +
|process_provision_digital_location_url=https://web.tee.gr/e-adeies/anakoinoseis/
 
}}
 
}}
 
{{process useful links
 
{{process useful links
|process_useful_link_title=Communications
+
|process_useful_link_title=1. Announcements
 
|process_useful_link_url=https://web.tee.gr/e-adeies/anakoinoseis/
 
|process_useful_link_url=https://web.tee.gr/e-adeies/anakoinoseis/
 
}}
 
}}
Line 405: Line 463:
 
}}
 
}}
 
{{process useful links
 
{{process useful links
|process_useful_link_title=Instructions for Use
+
|process_useful_link_title=3. User instructions
 
|process_useful_link_url=https://web.tee.gr/e-adeies/egcheiridia-chrisis-chrisima-entypa/
 
|process_useful_link_url=https://web.tee.gr/e-adeies/egcheiridia-chrisis-chrisima-entypa/
 
}}
 
}}
 
{{process useful links
 
{{process useful links
|process_useful_link_title=Architecture councils
+
|process_useful_link_title=Architecture Boards
 
|process_useful_link_url=https://web.tee.gr/e-adeies/sa/
 
|process_useful_link_url=https://web.tee.gr/e-adeies/sa/
 
}}
 
}}
 
{{process useful links
 
{{process useful links
|process_useful_link_title=E-Authorities Educational e-Authorities
+
|process_useful_link_title=e-Permits system educational video
 
|process_useful_link_url=https://www.youtube.com/watch?v=BK4t6y2-mL0
 
|process_useful_link_url=https://www.youtube.com/watch?v=BK4t6y2-mL0
 
}}
 
}}
Line 421: Line 479:
 
}}
 
}}
 
{{process useful links
 
{{process useful links
|process_useful_link_title=Communication
+
|process_useful_link_title=Contact
 
|process_useful_link_url=https://web.tee.gr/e-adeies/support/
 
|process_useful_link_url=https://web.tee.gr/e-adeies/support/
 
}}
 
}}

Latest revision as of 10:28, 25 July 2024



35c51f49-8a97-4971-a9c1-2f72a9089939 344883 Έκδοση οικοδομικών αδειών (e-Άδειες)

At a glance

Points of service

Municipalities, Technical Chamber

Number of required documents

10 to 18

Fees

From 10 to 20 €

Estimated Time (digitally)

1 minute

Description

Α building permit is required for the performance of any building works that do not fall under small-scale construction works, concerning in particular:

a) construction of, addition to and repair of buildings;

b) demolition of structures, excluding the cases referred to in paragraph 4;

c) excavation or backfill of plus/minus 0,80 metres, as well as floorings, preparations of plots and parcels for the purpose of building;

d) construction of a pool;

e) a change of use, if there is an adverse change in the data of the coverage diagram or in the design loads of the structural integrity study or a change in mechanical installations with regard to their passages from other floors or communal areas;

f) construction of retaining walls, as well as surrounding walls and fences that are not covered by the small-scale construction works approval;

g) construction of underground tanks;

h) works involving the installation of underground, prefabricated tanks for liquid and gaseous fuels at service stations;

i) works referred to in paragraph 2 of this Article, with a budget of over EUR 25,000, calculated in accordance with Annex B to Law 4495/2017, per horizontal or vertical property, without prejudice to the provisions of the penultimate paragraph thereof;

j) legalisation of all works carried out, which require issuance of a building permit. (see Article 29 of Law 4495/17 ‘Administrative acts for the performance of building works’). Categories of issuance method of building permits (Article 33 of Law 4495/17) The issuance method of building permits falls under different categories, depending on the area, location, use, size and environmental footprint of the building to be constructed, as follows:

Category 1:

a) construction of a special building in an area within the city plan with a surface area of more than 1,000 m2 and construction of a building with a predominantly residential use of more than 2,000 m2;

b) construction of a special building, in an area outside the city plan or within a demarcated settlement, in accordance with the Presidential Decree of 24 April 1985 (Government Gazette, Series IV, No 181) or within a settlement in existence since prior to 1923, with approved boundaries, in accordance with the Presidential Decree of 2 March 1981 (Government Gazette, Series IV, No 181);

c) construction of a building with residential use in an area outside the city plan where there is no cadastral registration or on land not fit for building according to the regulations;

d) addition of structure to a legally existing building with a special building use, provided that it exceeds fifty percent (50%) of the existing structures;

e) constructions and works on monuments listed by the Ministry of Culture and Sports;

f) constructions and works on listed buildings according to the Ministries of the Environment and Energy and of Culture and Sports;

g) construction or addition to plots or land within protected areas pursuant to Article 19 of Law 1650/1986 (Government Gazette, Series I, No 160) or zones, such as archaeological sites, historical sites, traditional settlements or traditional parts of the city;

h) construction or addition to or constructions and works on plots or land in contact with demarcated water streams;

i) construction or addition to plots or land and constructions and works on plots or land in contact with a demarcated shoreline or coastline;

j) fencing of plots of land with a frontage on an international, national or provincial road or plots of land within the city planning zone) works for the installation of underground tanks for liquid and gaseous fuels at service stations;

l) works involving the reconstruction of buildings and structures in general, falling within the scope of Presidential Decree of 8.2.1979 (Government Gazette, Series IV, No 130), unless otherwise set out in more specific provisions;

m) any case which does not fall under Categories 2 and 3.

Category 2:

a) construction of a building on a plot of land within a settlement in existence since prior to 1923, without approved boundaries;

b) legalisations of buildings and structures and changes in use of Article 106 of Law 4495/17;

c) construction or addition to or constructions and works on plots or land, where general or specific provisions provide for on-site inspection by the competent City Planning Agency.

Category 3:

(a) construction of a building in an area within an approved plan with a surface area of no more than 1,000 m2 floor space for special buildings and no more than 2,000 m2 floor space for buildings with a predominantly residential use;

b) construction of a building with a residential use in an area outside the city plan where there is cadastral registration and an approved General Urban Plan or a Plan for the Spatial and Residential Organisation of Open Cities on a plot that is fit for building in accordance with the regulations;

c) construction of a building on a plot within a demarcated settlement pursuant to the Presidential Decree of 24 April 1985 (Government Gazette, Series IV, No 181) for a building with a predominantly residential use;

d) addition of structure to a legally existing building, with a residential use;

e) addition of structure to a legally existing building with a special use, provided that the addition does not exceed fifty percent (50%) of the existing structures, inside and outside the city plan;

f) changes in the use of buildings or independent horizontal or vertical properties located in areas inside or outside the plan;

g) construction of a pool, provided it is not covered by the cases of approval of small-scale construction works;

h) retaining walls, surrounding walls and fences that do not fall under the category of small-scale construction works, without prejudice to Category 1 cases;

i) installation works for underground and prefabricated water tanks and sewage tanks; j) repair works and works to change the layout of lawfully existing buildings which do not fall under the cases referred to in Article 30;


k) works of the cases of Article 29(2) for which a building permit must be issued in accordance with their budget;

l) works for the installation of underground tanks for liquid and gaseous fuels at service stations.

Basic information

Competent body

MINISTRY OF ENVIRONMENT AND ENERGY

Authority/Public body’s Unit responsible for the institutional framework of the procedure

Service / organizational unit of a authority entity

Technical Chamber

Provided to

Related links

Validity duration

4 years

Notes

  • Engineers, with their personal access codes to My TEE, can issue and manage administrative acts for the performance of construction works (approvals, permits, revisions).
  • The competent bodies for the issuing of administrative acts relating to the performance of building works are the City Planning Agencies of municipalities, unless specific provisions provide otherwise (see Article 31(1) of Law 4495/17).
  • The procedure for submitting, checking and issuing the acts for the performance of building works pursuant to Article 28 is carried out exclusively online via the electronic platform of the Technical Chamber of Greece.
  • If the electronic submission information system is not functioning, the application for an administrative act must be submitted with an attached file containing the necessary supporting documents, in hard copy, to the Points of Single Contact (KEP), and is duly forwarded to the City Planning Agency.

Article 38 of Law 4495/17 Procedure for checking of a building permit: a) Permits falling under the issuance method of Categories 1, 2 and 3 with the preliminary approval of Article 36 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, provided for in Article 40.

  • The number of the building permit issued electronically shall be posted online without delay and construction works may commence, with a dossier containing the necessary supporting documents attached, in hard copy, to the Points of Single Contact (KEP), and is duly forwarded to the City Planning Agency.

Article 38 of Law 4495/17 Procedure for checking of a building permit: a) permits falling under the issuance method of Categories 1, 2 and 3 with the preliminary approval of Article 36 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, provided for in Article 40.

  • The building permit number issued electronically shall be posted online without delay and construction works may commence.

Last update

25/07/2024

Application

Application Type

Application

Submission by:

Submitted by the applicant (digital)

Submitted by:

Persons

Title

Application by the owner or by the person with a legitimate right together with the declarations of assignment - undertaking

Notes:

The declaration of assignment is made by the owner or the person with a legitimate right to the engineer of their choice in each case.

The declaration of undertaking is made by the corresponding engineer.

see Article 40(1.a), Law 4495/17

What you will need

Means of authentication, identification and signature

Entrance with TE Codes

    Print

    Requirements

      Fees

        Related


        Means of redress or appeal:

        Hierarchical appeal/recourse

        The above appeal must be filed within a deadline of thirty (30) days from the notification or otherwise full knowledge of the act by the interested party with its submission to the protocol office of the City Planning Agency that issued the contested act. Pursuant to Article 26 of Law 4495/2017, the Regional Councils for Urban Planning Issues and Disputes review the administrative appeals against enforceable acts or omissions of City Planning Agencies, which are issued during the issuance procedure of building permits.

        Output & Results

        Output

        Digital document production

        Steps

          Digital steps

            Other information

            Alternative titles

            Issuance of building permits (e-adeies) after preliminary approval, Get a building permit

            Official title

            Issuance of building permits (e-adeies)

            Languages supported

            Greek

            Legislation

              Categories

              Trigger

              Applied for

              Trigger (submission method)

              Application (digital)

              Type

              Outgoing

              ,,


            • 1 Possession of passwords to enter software Engineers are the sole applicants for the preliminary approval of a building permit and they must hold passwords to the digital services of the Technical Chamber of Greece.

              No No

            • 2 Urban planning Preliminary approval of a building permit


              No No

            • 3 Urban planning In the following cases, the preliminary approval of a building permit is mandatory (Article 35 of Law 4495/17): a) In newly-erected buildings with a surface area calculated to the floor space of more than 3,000 m2 and additions to existing buildings with a total resulting surface area calculated to the floor space of more than 3,000 m2. b) where a building permit needs to be issued by services other than the City Planning Agency, a preliminary building approval is compulsory and is granted by the competent City Planning Agency. c) for the construction of permanent building facilities, projects of particular environmental and residential importance, or projects subject to special inspection as regards building regulations, as well as in cases of buildings with a surface area of more than 3,000 m2.


              No No

            • 4 Urban planning Article 35 of Law 4495/17 For investment plans that have been included in Strategic Investments in accordance with the relevant legislative framework on strategic investments, as well as for investment projects submitted for assessment to ‘Enterprise Greece Invest & Trade S.A.’ in application of the same legislative framework as above, a preliminary approval must be issued by the Directorate-General for Strategic Investments of the Ministry of Development and Investments.


              No No

            • 1 TCG state fee 10 € - 20 €

              Cost Calculation One-off

              Method of Payment Bank cashier, Digital (debit / credit card), Digital (web banking)

              Type of Cost Impost

              No

            • 1 Αpplication by the owner or by the person with a legitimate right together with the declarations of assignment - undertaking. Approval

              Αpplication by the owner or by the person with a legitimate right together with the declarations of assignment - undertaking.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.b.

              Document submitted under requirements: Yes

              Document’s requirement: Building, Environmental, Urban planning

              No 8880

            • 2 Title of ownership, a recent certificate of ownership or a real estate sheet and an extract from a census for each property. Property titles

              Title of ownership, a recent certificate of ownership or a real estate sheet and an extract from a census for each property.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.c.

              Document submitted under requirements: No


              No 2905

            • 3 Evidence of the legality of any existing buildings Proof

              Evidence of the legality of any existing buildings

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Section 40 of Law 4495/17 §1.d.

              Document submitted under requirements: Yes

              Document’s requirement: Building, Urban planning

              No 3798

            • 4 Architectural study, including passive fire protection study and accessibility study for disabled persons, where appropriate Architectural drawing

              Architectural study, including passive fire protection study and accessibility study for disabled persons, where appropriate

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.e

              Document submitted under requirements: No


              No 3879

            • 5 Static study Drawings / studies by an engineer / architect

              Static study

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.f

              Document submitted under requirements: No


              No 5768

            • 6 Electromechanical installations studies Electromechanical drawing

              Electromechanical installations studies

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.g

              Document submitted under requirements: Yes

              Document’s requirement: Building, Environmental

              No 5280

            • 7 Building energy efficiency study Drawings / studies by an engineer / architect

              Building energy efficiency study

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See article 40 of Law 4495/17 §1.The building permit required for the construction of each building, newly rejuvenated or renovated radically, with a total surface over 50 (50) sq.m., is otherwise submitted with a thermonuclear adequacy study in accordance with the applicable institutional framework.

              Document submitted under requirements: Yes

              Document’s requirement: Building

              No 5768

            • 8 Planning period study for project execution Drawings / studies by an engineer / architect

              Planning period study for project execution

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.i

              Document submitted under requirements: No


              No 5768

            • 9 Study of plumbing and sewerage Drawings / studies by an engineer / architect

              Study of plumbing and sewerage

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Art. 40 (4495/17)

              Document submitted under requirements: No


              No 5768

            • 10 An active fire protection study, in accordance with the applicable provisions on fire protection, drawn up on the basis of a passive fire protection study, where necessary. Drawings / studies by an engineer / architect

              An active fire protection study, in accordance with the applicable provisions on fire protection, drawn up on the basis of a passive fire protection study, where necessary.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Art. 40 (4495/17)

              Document submitted under requirements: Yes

              Document’s requirement: Building

              No 5768

            • 11 Gas fuel study approved by the competent gas supply company. Drawings / studies by an engineer / architect

              Gas fuel study approved by the competent gas supply company.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: It concerns cases where gas fuel is used.

              Document submitted under requirements: Yes

              Document’s requirement: Building

              No 5768

            • 12 Drawing and Health Folder of the project (S.A. and F.A.S.) where required in accordance with the provisions of Law 305/1996 (A.212). Drawings / studies by an engineer / architect

              Drawing and Health Folder of the project (S.A. and F.A.S.) where required in accordance with the provisions of Law 305/1996 (A.212).

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.m

              Document submitted under requirements: No


              No 5768

            • 13 Waste Management Plan (ATA) Drawings / studies by an engineer / architect

              Waste Management Plan (ATA)

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See references to Article 40 of Law 4495/17 §1.d Data on waste management (LPD) are provided by at least the information provided in Article 7(2) under Article 36259/1757/E103/2010 of Decision (B.1312), which are accompanied by a copy of the signed contract of the Management of Excavations, Construction and Demolition (LPD) waste management (LPD) contract with an approved alternative management system (LPD) AEK or a decision approving the signed individual Alternative Management System (LPD) by the Board of Directors (LPD) of the Greek Recycling Organisation (LPD). For regional units where there is no approved Alternate Management System (LPDN) AEK, instead of the copy of the signed contract, a declaration by the AEKKK administration is required to ensure the management of the established AKKC and for the cooperation of the LPD in any phase of the implementation of its operations.

              Document submitted under requirements: No


              No 5768

            • 14 Symbolic declaration of planned parking areas. Notarary document

              Symbolic declaration of planned parking areas.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See references to Article 40 of Law 4495/17 §1.o Where a notarial declaration of parking is required in accordance with Article 1 of Law 1221/1981 (A 292), and a certificate of registration in the mortgage office or registering it in the office. In the event of acquisition, a proof of payment of the required contribution is submitted instead of a notarial statement.

              Document submitted under requirements: Yes

              Document’s requirement: Building, Urban planning

              No 3139

            • 15 Reasoned report Drawings / studies by an engineer / architect

              Reasoned report

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: Relative report of Article 3(1) of Law 1577/1985 (A 210)

              Document submitted under requirements: No


              No 5768

            • 16 Providing evidence of the required contributions from the owner of the project in favour of the State, e-ECA and the relevant municipality. Proof of payment / Receipt

              Providing evidence of the required contributions from the owner of the project in favour of the State, e-ECA and the relevant municipality.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.g

              Document submitted under requirements: No


              No 7053

            • 17 A copy of proof of service or an invoice relating to the payment of the agreed remuneration of the engineers, as well as the Engineer Income Tax (VAT) thereof. Proof of payment / Receipt

              A copy of proof of service or an invoice relating to the payment of the agreed remuneration of the engineers, as well as the Engineer Income Tax (VAT) thereof.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: See Article 40 of Law 4495/17 §1.h.

              Document submitted under requirements: No


              No 7053

            • 18 Submission of the relevant contribution form in case of redemption. Proof of payment / Receipt

              Submission of the relevant contribution form in case of redemption.



              Notes: See Article 40 of Law 4495/17 §1.c.

              Document submitted under requirements: Yes

              Document’s requirement: Building, Urban planning

              No 7053

            • Law 28-51 4495 2017 167 Α

              Description PART B – BUILDING FRAMEWORK CHAPTER ONE PROCEDURE FOR THE ISSUANCE AND CHECKING OF BUILDING PERMITS – CATEGORIES OF PERMITS


            • Law 4067 2012 79 Α

              Description New Building Regulation.


            • Ministerial Decision 3046/304 1989 59 Δ

              Description Building Regulation


            • 1 Authorised engineer’s entry to the TCG website

              Responsible for Implementation Third entity software

              Co-responsible for Implementation TECHNICAL CHAMBER OF GREECE

              Μethod of Implementation Data input in software

              Link https://web.tee.gr/e-adeies/anakoinoseis/

              Description Αccess to the electronic permit system by the authorized engineer.

              No No


            • 2 Application for a permit with preliminary approval

              Responsible for Implementation Third entity software

              Co-responsible for Implementation TECHNICAL CHAMBER OF GREECE

              Μethod of Implementation Data input in software

              Description Permits falling under the method of issuance of Categories 1, 2 and 3 with the preliminary approval of Article 36 of Law 4495/17 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, as provided for in Article 40 of Law 4495/17, through the electronic system of the TCG.

              No No


            • 3 Entry of the required designs and supporting documents into the system

              Responsible for Implementation Third entity software

              Co-responsible for Implementation TECHNICAL CHAMBER OF GREECE

              Μethod of Implementation Data input in software

              Description Permits falling under the method of issuance of Categories 1, 2 and 3 with the preliminary approval of Article 36 of Law 4495/17 shall be issued automatically, following the electronic submission of the dossier with the required supporting documents and the necessary designs, as provided for in Article 40 of Law 4495/17, through the electronic system of the Technical Chamber of Greece.

              No No


            • 4 Completion of procedure & issuance of building permit

              Responsible for Implementation Third entity software

              Co-responsible for Implementation TECHNICAL CHAMBER OF GREECE

              Μethod of Implementation Software action

              Description The building permit number issued electronically shall be posted online without delay and construction works may commence. The above checks shall be carried out within three (3) working days of the date of submission of the dossier.

              No No


            • 5 Project budget audit.

              Responsible for Implementation Entity software that performs the service

              Co-responsible for Implementation TECHNICAL CHAMBER OF GREECE

              Μethod of Implementation Software action

              Description Within a period of three (3) days from the issuance of the building permit, the City Planning Agency checks the required contributions and deductions of the project in favour of the State, municipality, e-EFKA, including the project budget audit, until the possibility of the automatic audit of the project budget by the IT system is activated (Article 38(6) of Law 4495/17).

              No No










            • Cookies help us deliver our services. By using our services, you agree to our use of cookies.