(One intermediate revision by the same user not shown) |
Line 11: |
Line 11: |
| *b) fall within the scope of Article 1(2.1) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but for which deviations from the passive fire protection study description have been identified, which affect aspects of the active fire protection study (Annex B). | | *b) fall within the scope of Article 1(2.1) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but for which deviations from the passive fire protection study description have been identified, which affect aspects of the active fire protection study (Annex B). |
| *c) fall within the scope of Article 1(2.2) and (2.3) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but which have not fully implemented their obligations with regard to integrated structural fire protection features. | | *c) fall within the scope of Article 1(2.2) and (2.3) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but which have not fully implemented their obligations with regard to integrated structural fire protection features. |
− | *Unless otherwise stipulated by fire department or special fire protection provisions, the duration of the temporary (active) fire protection certificate may not exceed six (6) months.
| + | |
− | *Undertakings and facilities that have already been granted a temporary (active) fire protection certificate do not have the right to seek reissue.
| + | Unless otherwise stipulated by fire department or special fire protection provisions, the duration of the temporary (active) fire protection certificate may not exceed six (6) months. |
− | *A prerequisite for the granting of a temporary (active) fire protection certificate is completion of the remaining fire protection measures and the installation of equipment provided for in the respective study. This certificate shall also specify any additional or increased fire protection measures and equipment required by the fire department and the deadlines by which they must be completed.
| + | |
− | *As of entry into force of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), paragraph 63 of Joint Ministerial Decision No 3021/19/6/1986 ‘Limitation of certificates and other supporting documents required by the current provisions for the processing of citizens’ cases by public sector services’ is no longer applicable (Government Gazette, Series II, No 847).
| + | Undertakings and facilities that have already been granted a temporary (active) fire protection certificate do not have the right to seek reissue. |
| + | |
| + | A prerequisite for the granting of a temporary (active) fire protection certificate is completion of the remaining fire protection measures and the installation of equipment provided for in the respective study. This certificate shall also specify any additional or increased fire protection measures and equipment required by the fire department and the deadlines by which they must be completed. |
| + | |
| + | As of entry into force of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), paragraph 63 of Joint Ministerial Decision No 3021/19/6/1986 ‘Limitation of certificates and other supporting documents required by the current provisions for the processing of citizens’ cases by public sector services’ is no longer applicable (Government Gazette, Series II, No 847). |
| |process_deadline_duration=P50D | | |process_deadline_duration=P50D |
| |process_evidence_identification_type=Other | | |process_evidence_identification_type=Other |
Line 44: |
Line 48: |
| |process_evidence_step_total_number=0 | | |process_evidence_step_total_number=0 |
| |process_evidence_step_digital_total_number=0 | | |process_evidence_step_digital_total_number=0 |
| + | |process_govgr_codes=16870 |
| + | |process_govgr_full_info=16870 |
| |process_application_type=Application | | |process_application_type=Application |
| |process_application_submission_type=Submitted by the applicant (digital) | | |process_application_submission_type=Submitted by the applicant (digital) |
Line 372: |
Line 378: |
| |process_step_description=Where the result of the on-the-spot check of the establishment by the designated verifier is unnecessarily or remarks, then the Head of the Office or the Local Branch of Preventive and Repressive Fire Safety Department shall approve in total the application ‘Edition of a temporary certificate of (active) fire protection’ and issue it by selecting a ‘Prevention’ which acquires a unique electronic key. | | |process_step_description=Where the result of the on-the-spot check of the establishment by the designated verifier is unnecessarily or remarks, then the Head of the Office or the Local Branch of Preventive and Repressive Fire Safety Department shall approve in total the application ‘Edition of a temporary certificate of (active) fire protection’ and issue it by selecting a ‘Prevention’ which acquires a unique electronic key. |
| |process_step_note=Co-ordinator: TECHNICAL CONTACT: https://web.tee.gr/e-adeies/egkriseis-py/ | | |process_step_note=Co-ordinator: TECHNICAL CONTACT: https://web.tee.gr/e-adeies/egkriseis-py/ |
− | }}
| |
− | {{process provision digital locations
| |
− | |process_provision_digital_location_title=(Active) fire protection approvals and certificates (e-adeies)
| |
− | |process_provision_digital_location_url=https://www.gov.gr/en/ipiresies/epikheirematike-drasterioteta/adeiodoteseis-kai-summorphose/egkriseis-kai-pistopoietika-energetikes-puroprostasias-e-adeies
| |
| }} | | }} |
| {{process useful links | | {{process useful links |