Line 153: |
Line 153: |
| |process_evidence_related_process=Solemn declaration and electronic solemn declaration | | |process_evidence_related_process=Solemn declaration and electronic solemn declaration |
| |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses |
− | |process_evidence_note=Mandatory supporting document of Case 1 of Annex C of the Fire Protection Decree No. 13/2021 (5519 B), for the issuance of (active) (#1) fire protection certificate without or with the performance of an autopsy: | + | |process_evidence_note=*Mandatory supporting document of Case 1 of Annex C of the Fire Protection Decree No. 13/2021 (5519 B), for the issuance of (active) (#1) fire protection certificate without or with the performance of an autopsy: |
− | Solemn Declaration (#2) of article 8 of Law 1599/1986 (75 A) of the supervisor or competent engineer according to the law, certified for authenticity of signature, that: | + | **Solemn Declaration (#2) of article 8 of Law 1599/1986 (75 A) of the supervisor or competent engineer according to the law, certified for authenticity of signature, that: |
− | a.) The passive (#3) / structural (#4) fire protection elements provided by the approved study, which affect the active fire protection means, have been taken and installed, all the terms and conditions provided by the applicable provisions and the applicable legislation on fire protection of buildings - facilities for the use of the business - facility have been met. | + | ***a.) The passive (#3) / structural (#4) fire protection elements provided by the approved study, which affect the active fire protection means, have been taken and installed, all the terms and conditions provided by the applicable provisions and the applicable legislation on fire protection of buildings - facilities for the use of the business - facility have been met. |
− | b.) The measures and means of active fire protection provided for by the applicable approved fire protection study and the applicable fire protection legislation for the use of the business - facility have been taken and installed, they meet the specifications of Fire Protection Ordinance No. 15/2014 (3149 B΄), as applicable, and the approved technical descriptions and are in good working order. | + | ***b.) The measures and means of active fire protection provided for by the applicable approved fire protection study and the applicable fire protection legislation for the use of the business - facility have been taken and installed, they meet the specifications of Fire Protection Ordinance No. 15/2014 (3149 B΄), as applicable, and the approved technical descriptions and are in good working order. |
− | c.) All certificates, attestations and other documents have been checked, such as Responsibility Statements of good workmanship by licensed installers per branch or specialty, if any, and the certificates of conformity of materials and structural elements installed in the business, inspection procedures and laboratory tests of reaction to fire, from which it is presumed that the equipment and installations of the business - installation comply with the requirements of the Fire Department Regulation No. 15/2014 (3149 B΄), as applicable at the time | + | ***c.) All certificates, attestations and other documents have been checked, such as Responsibility Statements of good workmanship by licensed installers per branch or specialty, if any, and the certificates of conformity of materials and structural elements installed in the business, inspection procedures and laboratory tests of reaction to fire, from which it is presumed that the equipment and installations of the business - installation comply with the requirements of the Fire Department Regulation No. 15/2014 (3149 B΄), as applicable at the time |
− | d.) There is a technical fire protection file for the facility, a copy of which is also kept in the file of the project owner (#5) at the companys headquarters. The file contains the approved fire protection design, the certified technical descriptions, certificates, manufacturers declarations of conformity/performance for all individual materials, instructions for their use and maintenance in accordance with European legislation, as well as other possible required documents, such as affidavits of good workmanship from licensed installers per branch or speciality, certificates of inspection bodies and additional studies, if required. | + | ***d.) There is a technical fire protection file for the facility, a copy of which is also kept in the file of the project owner (#5) at the companys headquarters. The file contains the approved fire protection design, the certified technical descriptions, certificates, manufacturers declarations of conformity/performance for all individual materials, instructions for their use and maintenance in accordance with European legislation, as well as other possible required documents, such as affidavits of good workmanship from licensed installers per branch or speciality, certificates of inspection bodies and additional studies, if required. |
− | NOTES: | + | *NOTES: |
− | (#1) An active fire protection certificate is issued in cases of businesses - establishments that fall under the scope of the fire protection regulations for buildings (p.d. 41/2018 (A΄ 80) or p.d. 71/1988 (A΄ 32). In businesses - establishments that fall under other fire protection regulations, a fire protection certificate is issued (Article 2 of Fire Protection Regulation No. 13/2021 (5519 B΄) - Definitions). | + | **(#1) An active fire protection certificate is issued in cases of businesses - establishments that fall under the scope of the fire protection regulations for buildings (p.d. 41/2018 (A΄ 80) or p.d. 71/1988 (A΄ 32). In businesses - establishments that fall under other fire protection regulations, a fire protection certificate is issued (Article 2 of Fire Protection Regulation No. 13/2021 (5519 B΄) - Definitions). |
− | (#2) In cases of enterprises - establishments where there are more than one (1) approved fire protection studies (such as an industrial establishment with several buildings or buildings with different uses or which uses for its operational needs LPG or petroleum products facilities, etc.), the Responsible Declaration shall refer to all the approved fire protection studies. | + | **(#2) In cases of enterprises - establishments where there are more than one (1) approved fire protection studies (such as an industrial establishment with several buildings or buildings with different uses or which uses for its operational needs LPG or petroleum products facilities, etc.), the Responsible Declaration shall refer to all the approved fire protection studies. |
− | (#3) The concept of passive fire protection refers to buildings falling within the scope of the fire protection regulations for buildings (Decree 41/2018 (A 80) or Decree 71/1988 (A 32) (par.2.1. of Article 1 and Article 2 - Definitions of the Fire Brigade Decree No. 13/2021 (5519 B)). | + | **(#3) The concept of passive fire protection refers to buildings falling within the scope of the fire protection regulations for buildings (Decree 41/2018 (A 80) or Decree 71/1988 (A 32) (par.2.1. of Article 1 and Article 2 - Definitions of the Fire Brigade Decree No. 13/2021 (5519 B)). |
− | (#4) The concept of structural fire protection refers to buildings subject to fire protection or special fire protection provisions (para. 2.2. and 2.3. of Article 1 and Article 2 - Definitions of the Fire Prevention Order No. 13/2021 (5519 B)). | + | **(#4) The concept of structural fire protection refers to buildings subject to fire protection or special fire protection provisions (para. 2.2. and 2.3. of Article 1 and Article 2 - Definitions of the Fire Prevention Order No. 13/2021 (5519 B)). |
− | (#5) According to article 8 of the decree 41/2018 (80 A) ".....The developer must keep a record of the certificates of materials and structural elements installed in the building. With the activation of the electronic identity of buildings, the above certificates are posted in the relevant electronic file of the building and are integral parts of it." | + | **(#5) According to article 8 of the decree 41/2018 (80 A) ".....The developer must keep a record of the certificates of materials and structural elements installed in the building. With the activation of the electronic identity of buildings, the above certificates are posted in the relevant electronic file of the building and are integral parts of it." |
| }} | | }} |
| {{process evidences | | {{process evidences |